The assessment identified the time frame for implementation which led to the priority order as<br />

shown in Figure 4.6. The first two corridors to be assessed for detailed design are part of the<br />

priority 1 identified as KL- Klang and KL- Taman Melawati corridors.<br />

Figure 4.6: BRT Corridors<br />

In developing the BRT network there are a number of associated initiatives which are outlined in a<br />

later section.<br />

4.6) Planning the Local Bus Network<br />

Chapter 2 outlined the current network in GKL/KV where the focus is currently on providing services<br />

to centre KL. During the LPTMP there will be a radical transformation of the overall LPT network as<br />

the rail network develops and the role of bus evolves with that development. In concept terms<br />

figure 4.7 shows the step changes involved.<br />

<br />

<br />

First stage: Network presently focuses on centre KL with operators competing to provide<br />

services on the main radial corridors and little service elsewhere, leading to gaps in the<br />

system.<br />

Second stage: In the short term there will be enhancements to the bus system through the<br />

provision of BRT, initially on key radial corridors. With the provision of these services, the<br />

existing services on that corridor will need to be reviewed and amended to reduce<br />

unnecessary competition and support the BRT services. Where there are gaps in the current<br />

network for existing development areas, these need to be reviewed and services allocated<br />

as appropriate.<br />