engineering or construction work commences on site and shall be retained for the full construction<br />

period.<br />

Reason To avoid the possibility of the public highway being affected by the deposit of mud and/or<br />

loose materials which could create a potential hazard to road users.<br />

11 No part of the development hereby approved shall commence until a scheme for the<br />

construction of the site access including service area access and the off-site works of highway<br />

improvement has been submitted to, and approved in writing by, the local planning authority in<br />

consultation with the Highway Authority. No part of the development hereby approved shall be<br />

occupied or opened for trading until the approved scheme has been constructed and completed in<br />

accordance with the scheme details.<br />

Reason: In order to satisfy the local planning authority and Highway Authority that the final details<br />

of the highway scheme/works are acceptable before works commence on site and in order that the<br />

traffic generated by the development does not exacerbate unsatisfactory highway conditions in<br />

advance of the completion of the highway scheme/works.<br />

12 Prior to the first use of the development hereby permitted, a Travel Plan shall be submitted to,<br />

and approved in writing by, the local planning authority. The Travel Plan shall be implemented<br />

within the timescale set out in the approved plan to the satisfaction of the local planning authority.<br />

Reason: In order to promote alternative non-car based means of transport.<br />

13 No works shall take place on the site until the applicant, or their agent or successors in title, has<br />

secured the implementation of a programme of building recording and analysis. This must be<br />

carried out in accordance with a written scheme of investigation, which shall first have been<br />

submitted to and approved in writing by the local planning authority.<br />

Reason: To ensure and safeguard the recording and inspection of matters of<br />

archaeological/historical importance associated with the building/site and to comply with Policy E6<br />

of the <strong>Hyndburn</strong> <strong>Borough</strong> Local Plan.<br />

14 The application site is near to a former landfill site. Prior to any development taking place, a<br />

comprehensive landfill gas site investigation and assessment shall be carried out to determine<br />

whether or not the site is, or would have the potential to be, affected by subterraneous landfill gas<br />

migration from the nearby landfill site. The survey methodology shall be agreed in writing by the<br />

local planning authority prior to the survey work commencing. Should the site investigation prove<br />

the presence of landfill gas then no development shall take place until appropriate designs, based on<br />

expert advice, are incorporated into the proposed construction and development area to alleviate<br />

any landfill gas associated risks to the development. Such designs shall be submitted to and<br />

approved in writing by the local planning authority prior to the commencement of the development.<br />

Reason: To safeguard the living conditions of the future occupants of the land in the interests of<br />

public safety and in order to comply with Policy E10 of the <strong>Hyndburn</strong> <strong>Borough</strong> Local Plan.<br />

15 No development approved by this permission shall be commenced until the application site has<br />

been subjected to a detailed investigation and recording of all potential contamination. The<br />

proposed methodology of the survey shall be submitted to and approved in writing by the local<br />

planning authority before any work commences. The findings of the survey shall be submitted to<br />