surrounding area. The changes would not, in my opinion, have a detrimental effect on the outward<br />
appearance of the development, and I consider the changes to be acceptable.<br />
The path which would have been provided in the approved scheme along part of the eastern<br />
boundary of the site was to enable access to the side of the adjacent industrial building for<br />
maintenance purposes. It would have been locked at each end and would not have been for public<br />
access. The applicants, concerned about the security aspects of having an enclosed area adjacent to<br />
the curtilage of a dwelling, wish to delete the path. The path would have no benefit to the general<br />
public, and I consider it acceptable that it be deleted.<br />
The application has been revised since originally submitted, replacing rear-facing double height<br />
windows with conventional windows in the first floor of the apartment block, and this change<br />
satisfactorily addresses the concerns of overlooking raised by the occupier of a property on<br />
Windsor Road. In my opinion, neighbouring residents would not suffer loss of amenity as a result<br />
of the proposed development.<br />
Recommendation<br />
Approve subject to the following conditions:<br />
Condition(s) and Reason(s)<br />
1 The development must be begun not later than the expiration of three years beginning with the<br />
date of this permission.<br />
Reason: Required to be imposed pursuant to Section 91 (as amended) of the Town and Country<br />
<strong>Planning</strong> Act 1990.<br />
2 The development hereby permitted shall not be carried out otherwise than in strict accordance<br />
with the submitted details.<br />
Reason: For the avoidance of doubt and to define the permission.<br />
3 Prior to the commencement of the development hereby approved, samples of the external<br />
roofing and facing materials shall be submitted to and approved in writing by the local planning<br />
authority. The development shall be constructed in accordance with the approved details/samples.<br />
Reason: To ensure the use of appropriate materials, in the interests of the visual amenities of the<br />
locality and in order to comply with Policy E10 of the <strong>Hyndburn</strong> <strong>Borough</strong> Local Plan.<br />
4 The development hereby permitted shall be carried out only in accordance with the plans<br />
submitted on 8.10.2007, with exception of the amended plans nos. 2007/34/AP04B &<br />
2007/34/AP02C received on 13.12.2007<br />
Reason: For the avoidance of doubt, since the originally submitted plan was subsequently amended<br />
5 The development hereby approved shall not commence until plans of the site showing details of<br />
the existing and proposed ground levels, proposed finished floor levels, levels of any paths, drives,<br />
garages and parking areas and the height of any retaining walls within the development site have<br />
been submitted to and approved in writing by the local planning authority. The development shall<br />
thereafter be carried out in complete accordance with the approved details.<br />
25