Operator's Manual-AVEA - Static Content
Operator's Manual-AVEA - Static Content
Operator's Manual-AVEA - Static Content
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Service <strong>Manual</strong> 35<br />
OVP Checklist<br />
This checklist is for use during the BEAR CUB 750vs Operational Verification Procedure.<br />
Serial Number Hour meter reading Today’s date<br />
Service Location Service Organization<br />
Address Address<br />
City/State/Zip City/State/Zip<br />
Contact Contact<br />
Phone ( ) Phone ( )<br />
Verification Steps<br />
STEP PASS FAIL STEP PASS FAIL<br />
Indicator Verification O2 Pressure Reading<br />
Verification<br />
Breath Rate Verification Low Gas Supply<br />
Verification(Air)<br />
Alarm Silence, Reset Verification Low Gas Supply Verification<br />
(O2)<br />
Exhalation Time, I:E Ratio<br />
Verification<br />
Fail to Cycle alarm<br />
verification<br />
Low Pressure alarm Verification FIO2 verification (21%, 60%,<br />
100%)<br />
High Pressure alarm/Limit<br />
Verification<br />
Low PEEP/CPAP alarm<br />
verification<br />
Pressure LED reset AC power loss verification<br />
Prolonged Inspiratory alarm<br />
verification<br />
Tidal Volume Limit<br />
verification<br />
High Rate alarm verification Flow Sensor alarm<br />
verification<br />
Apnea alarm verification Patient Triggering verification<br />
Incompatible setting alarm<br />
verification<br />
Air Pressure reading verification<br />
ADD Warning ?????<br />
Signature _________________________________________<br />
PROCEDURE COMPLETE<br />
Alarm loudness verification<br />
L2342 Revision B November 2004