12.07.2015 Views

E - VAE ProSys sro

E - VAE ProSys sro

E - VAE ProSys sro

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Fit the device using the mounting elements:− Fix the clamps at even distances in the gaps of the casing.Optimal spacing:• MT-30, MT-40, MT-45 one mounting element per side• MT-60, MT-91, MT-121 three mounting elements to the upper and lower sidesas well as one mounting element to each of the sidesthemselves.− Finger tighten the screws.− Check the position of the display, and take special care to check the correct seat of the sealing rubber.− Now tighten the clamping screws with a torque of 60N/cm.Caution:IP 65 (or IP 54 for MT-40 and MT-45) will be achieved by• quality installation and fitting• use of a flat and smooth mounting surface (after the clamping screws have been tightened)• the specified torque setting.Process display and control/ Device Manual/ Issue: 07.0125E

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!