12.07.2015 Views

S - Kam Ng PhD Dissertation Final.pdf - Digital Repository of CCEE ...

S - Kam Ng PhD Dissertation Final.pdf - Digital Repository of CCEE ...

S - Kam Ng PhD Dissertation Final.pdf - Digital Repository of CCEE ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1273.4.3. InstrumentationAll test piles were instrumented with strain gauges in pairs on either side <strong>of</strong> the webalong the centerline <strong>of</strong> the embedded pile length as shown in Figure 3.3 and Figure 3.5. Allstrain gauges were covered with a black flexible rubbery membrane and aluminum tape forprotection against welding sparks, heat and water. The strain gauge cables were alsowrapped with aluminum foil. As seen in Figure 3.5, the gauges and the cables were coveredwith 50 mm × 50 mm × 5 mm steel angles welded to the webs <strong>of</strong> the pile to prevent damagescaused by direct soil contact during pile installation. Despite the addition <strong>of</strong> the two steelangles, the shaft surface area in contact with the soil increases only by 4%. The steel angleswere chamfered at the pile toe to form a pointed end to minimize any increase in the toecross-sectional area.Prior to the pile installation, two strain transducers and two accelerometers <strong>of</strong> PDAwere installed at 750 mm (30-in) below the top <strong>of</strong> the pile. The strain transducers werebolted to both sides <strong>of</strong> the web along the centerline, and the accelerometers were attached toeither sides <strong>of</strong> the web at a distance <strong>of</strong> 75 mm (3-in) left and right <strong>of</strong> the strain transducers.The PDA recorded the strains and accelerations during pile driving and restrikes, which werelater converted to force and velocity records.3.4.4. Push-In pressure cellsTo measure the total lateral earth pressure and pore water pressure during piledriving, restrikes and static load tests (SLTs), Geokon Model 4830 push-in pressure cells(PCs) were inserted into the soil at a horizontal distance ranging from 200 mm (0.65 ft) to610 mm (2 ft) from test piles ISU5 and ISU6; PCs were not installed near ISU2, ISU3 andISU4. The PCs were installed one to two days before pile driving to ensure stabilization <strong>of</strong>lateral stress and pore water pressure readings as recommended by Suleiman et al. (2010). Toinstall each PC, a 100-mm (4-in) diameter borehole was drilled to a specified depth below theground surface using a hollow-stemmed auger. The PC was then lowered through thehollow-stemmed auger and pushed approximately 350 mm (1.15 ft) below the bottom <strong>of</strong> the

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!