12.07.2015 Views

S - Kam Ng PhD Dissertation Final.pdf - Digital Repository of CCEE ...

S - Kam Ng PhD Dissertation Final.pdf - Digital Repository of CCEE ...

S - Kam Ng PhD Dissertation Final.pdf - Digital Repository of CCEE ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Pile Resistance (kN)175geotechnical resistance charts given in the design manual were used for pile designs,especially to determine the number <strong>of</strong> piles and embedded pile lengths. Based on this staticanalysis method, fourteen (14) piles with each having an embedded length <strong>of</strong> approximately16.76 m were initially estimated. Based on the estimated pile length <strong>of</strong> 16.76 m, the averageSPT N-value was calculated as 12.2 using Eq. (4.5). Similarly, the average C h was calculatedto be 0.0297 cm 2 /min.= 12.20Construction StageBased on driving information on a trial pile using a Delmag D16-32 diesel hammer, ahammer blow count <strong>of</strong> 85 blow/m was recorded at the EOD. Based on a bearing chartgenerated using the WEAP-SA shown below, the pile resistance at the EOD (R EOD ) wasestimated to be 635 kN.Bearing Chart Generated Using WEAP-SA900800700635 kN60050040030020010000 20 40 60 80 100 120 140Hammer Blow Count (bl/m)The equivalent pile radius (r p ) was determined to be 4.97 cm and a time (t) <strong>of</strong> 5 days foraccounting pile setup was assumed. The nominal pile resistance at the time <strong>of</strong> 5 days afterthe EOD (R t ) was estimated using the proposed pile setup Eq. (4.9), and the differencebetween R t and R EOD yielded the pile setup resistance (R setup ).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!