12.07.2015 Views

S - Kam Ng PhD Dissertation Final.pdf - Digital Repository of CCEE ...

S - Kam Ng PhD Dissertation Final.pdf - Digital Repository of CCEE ...

S - Kam Ng PhD Dissertation Final.pdf - Digital Repository of CCEE ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

162( ) (4.8)where f c = consolidation factor; and f r = remolding recovery factor, which are tabulated inFigure 4.6 for both the CAPWAP and WEAP-SA. Since pile setup is influenced by thesuperposition <strong>of</strong> soil consolidation and recovery <strong>of</strong> the surrounding remolded soils, the effect<strong>of</strong> soil consolidation is best described by the first term on the right ( ) and the effect <strong>of</strong>recovery <strong>of</strong> the remolded soils is best accounted for by the remolding recovery factor (f r ).The two distinct best fit lines shown in Figure 4.6 indicate that a larger C value will beestimated based on the factors (f c and f r ) calibrated for the WEAP-SA analyses. Thedifference in the two best fit lines was attributed to the larger initial pile resistances estimatedat EOD (R EOD ) using CAPWAP, which resulted in the smaller C values determined fromFigure 4.3. Furthermore, a better match was observed for CAPWAP, represented with ahigher coefficient <strong>of</strong> determination (R 2 ) <strong>of</strong> 0.95. In other words, Eq. (4.8) based onCAPWAP has a better accuracy than that based on WEAP-SA in predicting the C value.4.4.3. Proposed methodThe pile setup rate (C) has been successfully quantified using Eq. (4.8). SubstitutingEq. (4.8) into setup Eq. (4.1), the proposed pile setup equation is expressed as*( ) ( ) + ( ) (4.9)It is important to note that this proposed pile setup equation is developed from ISU field testsbased on one size steel H-piles embedded in cohesive soils. Although it needs to bevalidated for other piles sizes and types (discussed later), when compared with the existingpile setup methods discussed early, the proposed pile setup method in Eq. (4.9) provides thefollowing advantages and simplifications for designers:-1. Considering a reference pile resistance at EOD which can be conveniently estimatedusing either WEAP-SA or CAPWAP;

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!