Pile Setup Rate (C)Pile Setup Rate (C)1860.180.160.140.12R² = 0.1527R² = 0.3130.10.080.060.040.02 CAPWAPWEAP-SA00 200 400 600 800 1000Initial Pile Resistance at EOD, R EOD (kN)Figure 4.5: Comparison <strong>of</strong> pile setup rate (C) to initial pile resistance0.220.2CAPWAPWEAP-SA0.180.16C = f c (C h /N a r p2 ) + f rR² = 0.6486 (WEAP-SA)0.140.120.10.080.060.04Method f c f rCAPWAP 39.048 0.088WEAP-SA 13.78 0.1495C = f c (C h /N a r p2 ) + f rR² = 0.9493 (CAPWAP)Test Pile N a C h (cm 2 /min) r p (cm)ISU2 5 0.208 5.05ISU3 8 0.045 5.05ISU4 10 0.056 5.05ISU5 12 0.028 5.05ISU6 14 0.022 5.050 0.0005 0.001 0.0015 0.002C h /N a r p2Figure 4.6: Correlations between pile setup rate (C) for different ISU field tests and soilparameters as well as equivalent pile radius

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!