12.07.2015 Views

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. Assembly and Installation2. The Stir-Ator wall track is installed as follows:a. Fasten the 3 hole connector to track using a 5/16" x 1" bolt through the first hole and a 5/16" splitlocking washer and hex nut. (This bolt does not go through the bin.) Tighten with socket head onimpact wrench. (See Figure 4C.)Figure 4Cb. Drill or punch 5/16" holes for the track bolts progressively around the bin wall, located 10-1/4"from the eave. Start with the double hole end of the track section, then drill or punch a holethrough the bin wall at the second hole location. Attach the track piece to the wall using a5/16" x 3" bolt. The bolt should go through the track, 3 hole connector, track bracket and bin wall.Fasten with a cup washer and a hex nut. Tighten with socket head on impact wrench.(See Figure 4D.)Figure 4D<strong>PNEG</strong>-<strong>1156ETL</strong> Design III Series Grain Stir-Ator CSA 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!