12.07.2015 Views

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4. Assembly and InstallationSwing ArmCAUTIONSwing arm is spring loaded. Extreme care must be exercised when cutting theshipping zip ties loose to avoid possibility of personal or bodily injury, as arm willsnap back when freed.1. Carefully remove the zip tie that are holding cord to swing arm.Junction Box1. Bolt trolley wire support rod to the top of the angle support with two (2) 1/4" x 5/8" flange bolt and1/4" hex flanged lock nuts. After removing the screw from the junction box cover, feed electrical wiresthrough the end loop of the wire support and into the junction box. <strong>Co</strong>nnect ends to terminal wiresthrough the end loop of the wire support and into the junction box. <strong>Co</strong>nnect ends to the terminal stripand the solid state electronic tilt switch electrical wire using wire connectors. (See Wiring Diagramson Pages 79-82 or See Figure 4Z.)Figure 4Z<strong>PNEG</strong>-<strong>1156ETL</strong> Design III Series Grain Stir-Ator CSA 33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!