12.07.2015 Views

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. Assembly and InstallationTrolleyNOTE: 36' and larger double auger trolleys require the hold-down rods to be moved to the bottom holeposition. This is done by removing the spring clip and pulling the rod out and reinserting it in thebottom holes from the side away from the down auger motors. Make sure holes are aligned.(See Figure 4N for proper location the hold-downs.)Figure 4N1. Place trolley on the frame with the junction box toward the center of the bin. Double and triple augertrolleys are placed on the frame rails from the inboard end. (See Figure 4O.)Figure 4ONOTE: Slide trolley in before the inboard. Make sure down auger motors are on the opposite side ofthe gear motor.<strong>PNEG</strong>-<strong>1156ETL</strong> Design III Series Grain Stir-Ator CSA 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!