4. Assembly and InstallationCheck MovementMove trolley from the extreme outboard end of the main frame to the inboard end and back again to besure there is no trolley interference and that there is sufficient electric cord allowed from the support swingarm to reach both ends.PowerA professional electrician must be employed to bring the power line to the Stir-Ator. The bin must begrounded and all the wiring must be done in accordance with local and national codes to avoid bodily injuryand even death.Installing Stir-Ator AugersDetermine the Required Length of the AugerInstall Stir-Ator augers by standing them up against the trolley to measure length. When measuring theauger length, be sure the trolley is close to the bin wall. If the unit has been correctly installed themeasurement between the drying floor and the Stir-Ator will be the shortest at the wall.The Stir-Ator augers should clear the drying floor by 3" for bins up to 30' and 4" for bins 33' and over.If a grain flow system or bin sweep is installed or to be installed, refer to the owner’s manual for thoseproducts or contact your dealer or The GSI Group for auger floor clearance specifications. (See Figure 4AUon Page 45.)44 <strong>PNEG</strong>-<strong>1156ETL</strong> Design III Series Grain Stir-Ator CSA

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!