12.07.2015 Views

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. Assembly and Installation2. For Double and Triple Auger Units: Bolt inboard frame end to frame rails using six (6) 3/8" and1" carriage bolts, 3/8" lock washers and hex nuts. The rounded side should be to the inside. Use thetwo (2) bottom holes. Tighten with socket head on impact wrench.NOTE: Locate bolt heads to the inside of the frame rails. Roll the trolley to be sure all wheelsturn freely. (See Figure 4P.)Figure 4P Inboard Frame End3. Place trolley drive arm through the square hole in the trolley body pointing toward the center ofthe bin (the sticker should face the down auger motor) and secure with two (2) 1/4" x 1-3/4" cotterpins, one above the trolley body and one below. Open bottom of the cotter pins to secure.(See Figure 4Q below and Figure 4R on Page 29.)Figure 4Q Double and Triple Auger Position28 <strong>PNEG</strong>-<strong>1156ETL</strong> Design III Series Grain Stir-Ator CSA

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!