12.07.2015 Views

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4. Assembly and InstallationNOTE: Two (2) hole locations are provided. The upper hole is used on single auger units only, asindicated on the decal. For double and triple auger units, use the lower hole. (See Figure 4R.)Figure 4R Double and Triple Auger Position4. Check that the trolley is level and that the hold-down rods and wheels are properly positioned.There should be approximately 1/4" between the top of the hold-down rods and the bottom of theframe rails. (See Figure 4S.)Figure 4S<strong>PNEG</strong>-<strong>1156ETL</strong> Design III Series Grain Stir-Ator CSA 29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!