12.07.2015 Views

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. Assembly and InstallationFigure 4ASWARNINGThe lead-in wire from the Stir-Ator to the switch box must be longer and looser thanthe shut off chain itself. Should the Stir-Ator malfunction and engage the shut off,this prevents the lead-in wire from being torn from the switch box which couldresult in serious electrical shock.Operating the Stir-Ator without the shut off chain properly assembled andinstalled could result in serious electrical shock or bodily injury and would voidthe warranty.See Pages 17, 23 and 24 for proper installation and clearance of the shut off chainand Stir-Ator.6. Hook wire support “S” hook to support chain approximately 12" above the shut off chain.(See Figure 4AT.)Design III Stir-AtorFigure 4AT7. After adjustments are completed, “S” hooks on the suspension chains and shut off chains shouldbe closed.<strong>PNEG</strong>-<strong>1156ETL</strong> Design III Series Grain Stir-Ator CSA 43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!