12.07.2015 Views

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4. Assembly and InstallationSwitch boxHandle extensionBoltChain clipFigure 4IFigure 4J2. Mount the switch box and circuit breaker box using the hardware provided with disconnect box, referto Design III Stir-Ator switch boxes and suspension parts list on Page 58. The breaker box is to bemounted on the outside of the bin in an accessible location. Wiring can then be ran to connect thebreaker box to the safety disconnect switch.3. Fasten shut off support chain(s) to bin roof using existing roof bolts and a 5/16" flat washer andhex nut. Three (3) support chains should be equally spaced between the switch box and the center ofthe bin.Design III Stir-AtorFigure 4KWARNINGMounting the box lower than the minimum recommended height could cause thebox to be caught by the Stir-Ator as it moves around the bin, causing possibledamage or serious electrical shock.<strong>PNEG</strong>-<strong>1156ETL</strong> Design III Series Grain Stir-Ator CSA 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!