12.07.2015 Views

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. Assembly and InstallationSuspension Chains1. The bin roof is then assembled and the suspension chains are dropped through the fill-hole. Two (2)chains are used on the single and double auger units and three (3) chains are used on thetriple auger units. Space the suspension hooks equally apart around the center fill-hole collar,placing them in reference to the manhole where the shut off switch box is to be located. Place chainsthrough the hole and then slide the chain down into the slot. (See Figure 4F and Figure 4G.) A holein the suspension hooks is provided if bolting the hooks in position is desired. NOTE: For GSIbins larger than 33' diameter an alternate method of mounting is to attach suspension chainto intermediate center collar. (See Figure 4H on Page 24.)Figure 4F Viewed from top of binFigure 4GWARNINGDo not use the bolt in the suspension hook to support the entire unit. The outsideend of the Stir-Ator should be supported by the track.<strong>PNEG</strong>-<strong>1156ETL</strong> Design III Series Grain Stir-Ator CSA 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!