12.07.2015 Views

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. Assembly and InstallationSlide the auger into the stub and align the holes in the stub shaft and the auger shaft. Place the augerclamp with the spring pin over the holes so the spring pin is inserted into the auger. Evenly torque theclamp bolts to 140 ft.-lbs. (See Figure 4AX.)Figure 4AXTo replace the auger, unbolt the auger clamp and remove the clamp and spring pin. This will allow theauger to be removed.WARNINGDo not run augers in an empty bin. Augers can whip and become entangledcausing damage to machine and/or bodily harm.<strong>PNEG</strong>-<strong>1156ETL</strong> Design III Series Grain Stir-Ator CSA 47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!