12.07.2015 Views

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

PNEG-1156ETL - David Manufacturing Co.

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. Assembly and InstallationYokes1. The yoke assembly is attached to the frame rails by placing the pivot tube into the center framesupport. If the pivot tube does not slide in readily, file any burrs and grease the inside of the centerframe support. Secure by placing a 1/4" x 3" cotter pin through the tube. Open the end of the cotterpin. The end yoke is bolted to the left frame rail with two (2) 3/8" x 1" carriage bolts, lock washers andhex nuts. Bolt from the inside out. Tighten with socket head on impact wrench. (See Figure 4T, Figure4U below, Figure 4V and Figure 4W on Page 31.)Figure 4TFigure 4U30 <strong>PNEG</strong>-<strong>1156ETL</strong> Design III Series Grain Stir-Ator CSA

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!