12.07.2015 Views

Sepulveda Dam Basin Master Plan - Los Angeles District - U.S. Army

Sepulveda Dam Basin Master Plan - Los Angeles District - U.S. Army

Sepulveda Dam Basin Master Plan - Los Angeles District - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Sepulveda</strong> <strong>Dam</strong> <strong>Basin</strong><strong>Master</strong> <strong>Plan</strong> and Environmental Assessmentpreparation of visual communications. The manual covers the use of the logo in business cards,signs, publications, forms, vehicles, and miscellaneous items.EP 310-1-6a, 232 Sign Standards Manual, VOL 1, 01 Jun 2006, provides direction and guidancefor signage, including planning, use, placement, materials, and maintenance, at Corps CivilWorks water resource projects.EP 310-1-6b, Sign Standards Manual, VOL 2, Appendices, 01 Jun 2006, provides guidance onprocurement procedures, materials and specifications, sign maintenance procedures, typographyreference, reference material, and reproduction materials for signage at Corps water resourceprojects.EP 1130-2-429, Volunteer Coordinator's Handbook, 30 Apr 1993, provides assistance tovolunteer program coordinators in preparing volunteer management plans, and guidance onprocedures for administrating effective volunteer programs at Corps projects and offices.EP 1130-2-540, Environmental Stewardship and Maintenance Guidance and Procedures, 15 Nov1996 (original); 04 Nov 2002 (change 1); 31 Jul 2005 (change 2); 11 Aug 2008 (change 3),establishes guidance for the management of environmental stewardship-related operations andmaintenance activities at Corps civil works water resource projects and supplements ER 1130-2-540, Environmental Stewardship Operations and Maintenance Policies.EP 1130-2-550, Project Operations-Recreation Operation and Maintenance Guidance andProcedures, 15 Nov 1996 (original); 01 Oct 1999 (change 1); 01 Mar 2002 (change 2); 15 Aug2002 (change 3); 30 Aug 2008 (change 4), establishes guidance for the management ofrecreation programs and activities, and for the operation and maintenance of Corps recreationamenities and related structures, at civil works water resource projects and supplements ER1130-2-510, Recreation Operation and Maintenance Policies. <strong>Master</strong> <strong>Plan</strong>s and operationalmanagement plans are to be developed in accordance with the guidance on master planning andreport content contained in Chapter 3 of both ER and EP 1130-2-550.EP 1165-2-502, Ecosystem Restoration – Supporting Policy Information, 30 Sep 1999, providespolicy information in support of ER 1165-2-501 to guide Corps of Engineers involvement inecosystem restoration and protection through Civil Works programs and activities.Engineering ManualsEM 1110-1-400, Recreation Facility and Customer Services Standards, 01 Nov 2004, providesgeneral guidance for the rehabilitation of existing, and the design and construction of newrecreation areas and amenities, the provision of customer services, and recreation programevaluation activities at recreation areas managed by the Corps of Engineers. The overall purposeof this document is to establish a uniform level of quality nationwide by which Corps-managedparks will meet the needs of current and future park customers.EM 1110-2-410, Design of Recreation Areas and Amenities – Access and Circulation, 31 Dec1982, presents data compiled from experience and research that may be useful to CorpsIntroduction 1-12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!