Commissioning flow chart (threepart)Commissioning of the A-ISOMETER® (2)Connect the supplyvoltage USConnect the voltage Un of theIT system to be monitoredThe A-ISOMETER carries out aself test. The display indicatesthe insulation value after finishingthe measurement.Only <strong>IRDH375</strong>B:set the clockShall the basic settingbe changed?Alarm1 = 40 kWAlarm2 = 10 kWK1/K2 = N/O operationMemory = offnoyesSelect ISO SETUP(see chapter operation and setting)Does one of the alarm LEDslight up?noyesThe insulation value of the systembeing monitored is below the presetresponse value. Change the responsevalue or improve the insulationcondition of the system.TGH1352en/11.200423

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!