Year of<strong>Project</strong>Area of oilpalmTable 23. Annual CO 2 e sequestration by palm oil (t CO2e yr-‐1)Annual CO2e sequestration by palm oil (t CO 2 e yr-‐1)Concession 1Borneo Eka SawitTangguhConcession 2Graha Indo SawitAndal TunggalConcession 3Wahana AgroTama MakmurConcession 4<strong>Rimba</strong> SawitUtama PlanindoAnnual total (tCO 2 e yr -‐1)CumulativeTotal (t CO 2 e)1 0 0 0 0 0 0 02 2000 0 0 0 0 0 03 6000 5,353 0 0 0 5,353 5,3534 12000 24,546 5,353 0 0 29,900 35,2535 18000 55,179 24,546 5,353 0 85,078 120,3326 20000 94,970 55,179 24,546 5,353 180,049 300,3817 20000 121,599 87,634 55,179 24,546 288,958 589,3398 20000 144,648 109,649 92,988 55,179 402,463 991,8029 20000 157,074 120,782 134,195 92,988 505,039 1,496,84110 20000 159,852 123,360 173,906 131,197 588,315 2,085,15611 20000 155,581 119,959 203,634 159,854 639,028 2,724,18312 20000 146,733 112,763 217,860 174,640 651,997 3,376,18013 20000 135,275 103,436 219,045 177,794 635,549 4,011,72914 20000 122,640 93,165 210,993 172,650 599,448 4,611,17715 20000 109,812 82,753 197,107 162,190 551,863 5,163,04016 20000 97,425 72,713 180,028 148,733 498,899 5,661,93917 20000 85,856 63,348 161,650 133,949 444,803 6,106,74118 20000 75,304 54,814 143,255 118,976 392,349 6,499,09019 20000 65,844 47,170 125,655 104,543 343,212 6,842,30220 20000 57,475 40,412 109,323 91,081 298,291 7,140,59421 20000 50,146 34,497 94,495 78,814 257,952 7,398,54622 20000 43,778 29,360 81,249 67,826 222,214 7,620,76023 20000 38,280 24,927 69,562 58,111 190,881 7,811,64024 20000 33,558 21,121 59,348 49,607 163,634 7,975,27525 20000 29,519 17,886 50,488 42,222 140,095 8,115,37026 20000 26,076 15,092 42,849 35,848 119,865 8,235,23527 20000 23,149 12,733 36,296 30,375 102,553 8,337,78828 20000 20,665 10,733 30,694 25,694 87,788 8,425,57529 20000 18,563 9,040 25,923 21,705 75,231 8,500,80630 20000 16,786 7,609 21,868 18,314 64,577 8,565,383Totals 2,115,689 1,500,014 2,767,491 2,182,189 8,565,383115
Year of<strong>Project</strong>Area burnedyr-‐1Table 24. Annual CO 2 e emissions from peat burning (t CO2e yr-‐1)Annual CO2e emissions from peat burning (t CO2e yr-‐1)Concession 1Borneo Eka SawitTangguhConcession 2Graha Indo SawitAndal TunggalConcession 3Wahana AgroTama MakmurConcession 4<strong>Rimba</strong> SawitUtama PlanindoAnnual total (tCO 2 e yr -‐1)CumulativeTotal (t CO 2 e)1 2,000 275,837 0 0 0 275,837 275,8372 4,000 275,837 275,837 0 0 551,673 827,5103 6,000 275,837 275,837 275,837 0 827,510 1,655,0194 8,000 275,837 275,837 275,837 275,837 1,103,346 2,758,3655 6,986 135,987 275,837 275,837 275,837 963,497 3,721,8626 4,857 0 275,837 118,196 275,837 669,869 4,391,7317 4,000 0 275,837 0 275,837 551,673 4,943,4048 2,503 0 69,373 0 275,837 345,209 5,288,6139 1,379 0 0 0 190,189 190,189 5,478,80210 0 0 0 0 0 0 5,478,80211 0 0 0 0 0 0 5,478,80212 0 0 0 0 0 0 5,478,80213 0 0 0 0 0 0 5,478,80214 0 0 0 0 0 0 5,478,80215 0 0 0 0 0 0 5,478,80216 0 0 0 0 0 0 5,478,80217 0 0 0 0 0 0 5,478,80218 0 0 0 0 0 0 5,478,80219 0 0 0 0 0 0 5,478,80220 0 0 0 0 0 0 5,478,80221 0 0 0 0 0 0 5,478,80222 0 0 0 0 0 0 5,478,80223 0 0 0 0 0 0 5,478,80224 0 0 0 0 0 0 5,478,80225 0 0 0 0 0 0 5,478,80226 0 0 0 0 0 0 5,478,80227 0 0 0 0 0 0 5,478,80228 0 0 0 0 0 0 5,478,80229 0 0 0 0 0 0 5,478,80230 0 0 0 0 0 0 5,478,802Totals 39,725 1,239,333 1,724,392 945,705 1,213,681 5,478,802116
- Page 1 and 2:
The Rimba Raya Biodiversity Reserve
- Page 3 and 4:
AcknowledgementsWith Special Recogn
- Page 5 and 6:
ContentsContents ..................
- Page 7 and 8:
BIODIVERSITY SECTION ..............
- Page 9 and 10:
GLOSSARY OF PROJECT SPECIFIC TERMSC
- Page 11 and 12:
REDD, which is necessarily conserva
- Page 13 and 14:
Rehabilitation Center (OFI), home t
- Page 15 and 16:
estricted-‐range, or otherwise
- Page 17 and 18:
HydrologyWatersheds in the Project
- Page 19 and 20:
SoilA soil map for the Project Zone
- Page 21 and 22:
ClimateRainfall in the Project Zone
- Page 23 and 24:
Compositionally, freshwater swamps
- Page 25 and 26:
selective logging, intensive loggin
- Page 27 and 28:
G1.3. Boundaries of the Project Are
- Page 29 and 30:
Communities in the Project ZoneThe
- Page 31 and 32:
Delineation of the Project Zone. To
- Page 33 and 34:
the project and recommending that t
- Page 35 and 36:
During the ground surveys, aerial s
- Page 37 and 38:
Stratification by Peat Distribution
- Page 39 and 40:
G1.5. Description of Project Zone C
- Page 41 and 42:
Only a few of the communities have
- Page 43 and 44:
livelihoods, providing protection f
- Page 45 and 46:
Similar to the other villages along
- Page 47 and 48:
company. On average, farmers and fi
- Page 49 and 50:
categories: housing, office, agricu
- Page 51 and 52:
Table 6. Current Community Conflict
- Page 53 and 54:
and six are Vulnerable (VU). CR spe
- Page 55 and 56:
eight are listed as Vulnerable. Eig
- Page 57 and 58:
2004). These losses highlight the i
- Page 59 and 60:
small mammal species richness decli
- Page 61 and 62:
even fewer forest species than plan
- Page 63 and 64:
Other threats to biodiversityAdditi
- Page 65 and 66:
HCV1.1Table 8. Preliminary evaluati
- Page 67 and 68:
of water supplies and prevention of
- Page 69 and 70:
ladang agriculture, scrub, short se
- Page 71 and 72:
Table 11. Critically Endangered Hig
- Page 73 and 74: d. areas that support significant c
- Page 75 and 76: G1.8.2. Significant Large Landscape
- Page 77 and 78: It is possible that a degree of per
- Page 79 and 80: The revised Toolkit for Indonesia i
- Page 81 and 82: the assessment area; and second, an
- Page 83 and 84: HCV 4.3HCV 4.3 aims to identify and
- Page 85 and 86: Within the Project Area and neighbo
- Page 87 and 88: G1.8.6. Areas Critical for Traditio
- Page 89 and 90: In 2004, five oil palm estates were
- Page 91 and 92: Figure 23. Comparison of the new dr
- Page 93 and 94: Table 15. Extent of Overlap w/ Oil
- Page 95 and 96: Baseline analysis: LandcoverIn orde
- Page 97 and 98: All survey data has been entered in
- Page 99 and 100: For a complete report on the Carbon
- Page 101 and 102: Identification of Baseline Scenario
- Page 103 and 104: Under Indonesian legislation, Law (
- Page 105 and 106: drained due to the realization that
- Page 107 and 108: conversion for urban, rural, and in
- Page 109 and 110: to 2002. Furthermore, deforestation
- Page 111 and 112: Local Perspective. Tanjung Puting N
- Page 113 and 114: Table 17. 2000-‐2008 Palm Oil E
- Page 115 and 116: Provincial Government Targets Rimba
- Page 117 and 118: to recovery from past disturbance,
- Page 119 and 120: StratumTable 20. Calculations of CO
- Page 121 and 122: Year ofProjectArea loggedyr-‐1T
- Page 123: GHG removals from oil palm sequestr
- Page 127 and 128: Year ofProjectArea burnedyr-‐1T
- Page 129 and 130: Yr ofProjectTable 26. Net baseline
- Page 131 and 132: environmental impacts and the need
- Page 133 and 134: triggered by palm-‐oil companie
- Page 135 and 136: G3. Project Design and GoalsG3.1. S
- Page 137 and 138: elements and an assessment of the P
- Page 139 and 140: habitat in terms of canopy and food
- Page 141 and 142: Funding of OFI activitiesTanjung Pu
- Page 143 and 144: interventions can improve the poor
- Page 145 and 146: Community Agro-‐Forestry. In ke
- Page 147 and 148: The only requirement is to pump the
- Page 149 and 150: The Rimba Raya project proponents i
- Page 151 and 152: www.kiva.org as highly reputable fi
- Page 153 and 154: purchases more than $24 million dol
- Page 155 and 156: The comparative analysis will be us
- Page 157 and 158: G3.4. Project Lifetime, Accounting
- Page 159 and 160: Table 28. Rimba Raya Implementation
- Page 161 and 162: 2-‐Establishment ofRimba RayaRe
- Page 163 and 164: 6-‐Development ofSocial Buffer2
- Page 165 and 166: 7-‐Outreach andEducation3-‐
- Page 167 and 168: Pembuang Hulu and Tanjung Hanau reg
- Page 169 and 170: .7. Determination of the need for s
- Page 171 and 172: elationship with oil palm companies
- Page 173 and 174: capital.” In order to ensure that
- Page 175 and 176:
G3.8. Stakeholder Identification an
- Page 177 and 178:
2. Improve multi-‐stakeholder p
- Page 179 and 180:
Community Involvement during Projec
- Page 181 and 182:
31 26/12/08 Burhanudin Merchant Des
- Page 183 and 184:
Table 31. Rimba Raya Project Proces
- Page 185 and 186:
G3.9. CCBA Public Comment PeriodDes
- Page 187 and 188:
In some contexts, for example where
- Page 189 and 190:
Table 32. Required Skill Sets , Key
- Page 191 and 192:
Develop areforestationprogramaround
- Page 193 and 194:
Figure 38 PT Rimba Raya Conservatio
- Page 195 and 196:
Figure 40. Project Organizational C
- Page 197 and 198:
manipulated to serve someone’s pe
- Page 199 and 200:
13). One area of special considerat
- Page 201 and 202:
also provide training in the skills
- Page 203 and 204:
Communitycenters &librariesWater fi
- Page 205 and 206:
C102 - Social Security (Minimum Sta
- Page 207 and 208:
G5.2. Documentation of Project Appr
- Page 209 and 210:
Figure 42. Official Land Area Verif
- Page 211 and 212:
Figure 44. Original Letter from Gov
- Page 213 and 214:
Figure 45. Original Minister’s De
- Page 215 and 216:
Encroachment by Palm Oil Plantation
- Page 217 and 218:
CLIMATE SECTIONCL1. Net Positive Cl
- Page 219 and 220:
CL1.5. Double Counting of Emissions
- Page 221 and 222:
Negative leakage is the unanticipat
- Page 223 and 224:
undervalued. Moreover, the argument
- Page 225 and 226:
et. al., 2005). However the long te
- Page 227 and 228:
edistributed such that the most eff
- Page 229 and 230:
The intersection of the hypothetica
- Page 231 and 232:
dedicated to bio-‐fuel producti
- Page 233 and 234:
Without project activities are disp
- Page 235 and 236:
Table 36. Assessment of risk factor
- Page 237 and 238:
Table 36. ...continuedRiskFactorLik
- Page 239 and 240:
Table 37. ...continuedRisk Factor %
- Page 241 and 242:
degraded portions of the Project Ar
- Page 243 and 244:
CL2.4. Leakage and non-CO2 GasesNon
- Page 245 and 246:
Monitoring of the boundary of the p
- Page 247 and 248:
Monitoring will be conducted by a p
- Page 249 and 250:
Table 38. InfiniteSUSTAINABILITY Ma
- Page 251 and 252:
Phinisi FloatingClinicMicro-Finance
- Page 253 and 254:
Table 39. Threats and management re
- Page 255 and 256:
Hunting - Communities in the Projec
- Page 257 and 258:
All five of these capital assets ar
- Page 259 and 260:
Hygiene improvesProportion of house
- Page 261 and 262:
LARASITAProject proponents will wor
- Page 263 and 264:
B1.2. Impact of Project Activities
- Page 265 and 266:
HCV 1.1 Support Function to Protect
- Page 267 and 268:
further losses. Protection of non-
- Page 269 and 270:
five are listed as Endangered by IU
- Page 271 and 272:
HCV 2.3 Areas that Contain Populati
- Page 273 and 274:
Table 42. Species to be used for Ri
- Page 275 and 276:
negative. In this scenario, net bio
- Page 277 and 278:
permanent 10-‐20 km transects s
- Page 279 and 280:
high resolution imagery) and field
- Page 281 and 282:
e present in the Seruyan River insi
- Page 283 and 284:
The Rimba Raya Project is located i
- Page 285 and 286:
intentionally or unintentionally, f
- Page 287 and 288:
GL3. Exceptional Biodiversity Benef
- Page 289 and 290:
Table 44. Endangered & Critically E
- Page 291 and 292:
GL3.2.2. Species with Large but Clu
- Page 293 and 294:
BIBLIOGRAPHYAnderson, J.A.R. (1972)
- Page 295 and 296:
Gibbs, H., (2008) Carbon payback ti
- Page 297 and 298:
Nicolas, Marc V.J. and Grant S. Bee
- Page 299 and 300:
Islands]. In Press.Susilo, H.D. (19