(SAR) to Support Agricultural Monitoring 2 - Group on Earth ...
(SAR) to Support Agricultural Monitoring 2 - Group on Earth ...
(SAR) to Support Agricultural Monitoring 2 - Group on Earth ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Internati<strong>on</strong>al GEO Workshop <strong>on</strong> <str<strong>on</strong>g>SAR</str<strong>on</strong>g> <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>Support</str<strong>on</strong>g> <str<strong>on</strong>g>Agricultural</str<strong>on</strong>g> M<strong>on</strong>i<str<strong>on</strong>g>to</str<strong>on</strong>g>ring<br />
3.3 Transiti<strong>on</strong>ing from Research <str<strong>on</strong>g>to</str<strong>on</strong>g> Operati<strong>on</strong>al Use and Capacity<br />
Building<br />
This secti<strong>on</strong> summarizes the main findings of the three breakout groups for Transiti<strong>on</strong>ing<br />
from Research <str<strong>on</strong>g>to</str<strong>on</strong>g> Operati<strong>on</strong>al Use and Capacity Building. Again, the findings of the three<br />
breakout groups are shown in Appendix C.<br />
The first priority challenge was <str<strong>on</strong>g>SAR</str<strong>on</strong>g> Data, in particular the following attributes:<br />
• Cost<br />
• Mode of purchase<br />
• In-situ data<br />
• Interoperability.<br />
The sec<strong>on</strong>d priority challenge was Training and Acquiring Knowledge <str<strong>on</strong>g>to</str<strong>on</strong>g> Use the Data<br />
and Understanding the Applicati<strong>on</strong> of the Data. This challenge had the following aspects:<br />
• Cost of training<br />
• Locati<strong>on</strong><br />
• Language<br />
• Relevancy.<br />
The third priority challenge was Tools, including:<br />
• Software <str<strong>on</strong>g>to</str<strong>on</strong>g>ols for different levels of users<br />
• Ease of use of Software <str<strong>on</strong>g>to</str<strong>on</strong>g>ols<br />
• Hardware<br />
• Complementary (field) <str<strong>on</strong>g>to</str<strong>on</strong>g>ols<br />
• Accessing technical support.<br />
The fourth priority challenge was Infrastructure. C<strong>on</strong>siderati<strong>on</strong>s here c<strong>on</strong>sisted of:<br />
• Internet capacity<br />
• Human capacities<br />
• Instituti<strong>on</strong>al capacity.<br />
The fifth priority challenge was Managerial and Political <str<strong>on</strong>g>Support</str<strong>on</strong>g>.<br />
The main Challenges/ Soluti<strong>on</strong>s/ Acti<strong>on</strong>s/ Owners are shown in Table 3.<br />
22