(2) Indirect loss referred to above in section 11(3) and (4) shall, however, becompensated for by the contractor only if the defect or loss is due to negligenceon his part.(3) Compensation under this section shall also cover personal injury and propertydamage incurred by the commissioner because of the defect. However, thissection does not apply:(1) to the compensation of personal injury caused by an element delivered or bya defect in the material of a performance effected;(2) to the compensation of property damage caused by an element delivered orby a defect in the material of a performance effected if the damage is causedto other property than the building or residential movable property that isprimarily in private use; nor(3) to the compensation of property damage caused by a defect in a piece ofequipment belonging to the fixtures of a building if the damage is caused toproperty that does not have an direct connection of use with the equipment.(4) A member of the commissioner’s family who suffers loss for the defect shall havethe same right to damages as the commissioner.Section 21 — Liability of a third party (16/1994)The provisions of chapter 5, section 22 apply correspondingly to a performancereferred to in this chapter.Section 22 — Liability for an error in an estimate (16/1994)If the contractor has given the commissioner an estimate for the cost of supplies,work and measures necessary for the completion of a building, but which are notincluded in the contractor’s own performance, and if the commissioner has hadgood reason to rely on the estimate not being essentially exceeded, thecommissioner shall be entitled to a reasonable compensation if the contractor, inpreparing the estimate, has not proceeded with care and if the costs incurred bythe commissioner are therefore considerably higher than estimated.Price and its paymentSection 23 — Cost estimate (16/1994)If the delivery of the elements or the service relating to the performance of thecontractor referred to in section 1(2) has not been agreed to be effected for a fixed69

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!