13.07.2015 Views

Dec 2010 - South Worcestershire Development Plan

Dec 2010 - South Worcestershire Development Plan

Dec 2010 - South Worcestershire Development Plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SOUTH WORCESTERSHIRE ANNUAL MONITORING REPORT <strong>2010</strong>211Cross Business Park at Droitwich Spa has one plot remaining, and at Vale Park WestEvesham, Phase 1 has been speculatively developed attracting several significant localemployers.Amount of completed retail, office and leisure development9,798m 2 of office (B1a) and retail (A1 & A2) development has been recorded ascompleted during the monitoring period. This is significantly higher than last year, wherethe figure was 6,688m². This figure excludes leisure development as we currently onlymonitor leisure developments incorporating more than 1,000m 2 gross of builtdevelopment and in the case of hotels, only those with more than 5 bedrooms. Duringthe monitoring period there were two leisure development completions. These wereWorcester Rugby Football Club which consisted of the redevelopment of the East standand hospitality suite and the completion of Evesham Leisure Centre which was a newdevelopment to include a café, community pool and studios.Percentage of completed retail, office and leisure development in town centres31% of completed retail and office development floorspace was in town centres(excludes leisure), it must be noted that these sites are not in the defined shoppingfrontages as stated in the adopted Wychavon District Local <strong>Plan</strong>, but are still consideredto be town centre sites.Table 71: Total amount of completed floorspace for town centre usesTown CentreEmploymenttype m2 %B1 (a) 349 5%A1 1871 91%A2 273 100%D2 0 0Total 2493Local Authority AreaEmployment type m2 %B1 (a) 7734 77%A1 2064 20%A2 273 3%D2 0 0%Total 10071 100Policy SR2Sufficient land will be provided in the District to enable the construction of 110 hectaresof employment land in B1, B2 and B8 uses between April 1996 and March 2011. Theresidual element of this requirement plus additional land to meet specific employmentneeds will be met through allocations. The allocations will comprise the following sitesidentified on the Proposals Map.In 2009/<strong>2010</strong>, 62 planning applications were granted approval for businessdevelopment, with site areas totalling 25.95ha and approved floorspace of 51,557m2. Alarge proportion of this floorspace was for the detailed applications for Phase II of theLocal <strong>Plan</strong> allocation at Vale Park Evesham.At 31st March <strong>2010</strong> there were 39.25 ha of unimplemented planning permissions and24.47 ha of employment land under construction. Therefore the amount of employmentland available i.e. those not started, under construction, and allocated totals 76.4 ha

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!