Joints for ductile iron pipe shall conform to the latest standard of ANSI/AWWA C111/A21.11<br />

for rubber gasket joints. Protecto 401 lined ductile iron pipe shall conform to the latest<br />

<strong>standards</strong> of ANSI/AWWA C104/A21.4<br />

Above ground ductile iron pipe shall be Protecto 401 lined flanged Pressure Class 53 with<br />

<strong>minimum</strong> wall thickness of 0.32 for 4-inch pipe and incremental increases of 0.02” thickness<br />

for each pipe diameter increase up to 14-inches. Ductile iron pipe greater than 14-inches<br />

shall be submitted to the Department.<br />

All above ground DIP shall be coated with green paint as follows:<br />

Sandblast and remove all paint and any loose material in accordance with SSPC SP-10.<br />

Sandblasting shall be performed using non-silca media. Do not paint or coat any<br />

nameplates, brass or stainless steel surfaces. Contractor shall use the following paint system<br />

or approved equal.<br />

TNEMEC<br />

1) Primer: TNEME-ALUMINUM MASTIC #135<br />

(3.0 to 5.0 mils DFT)<br />

2) Intermediate Series 66 Epoxoline<br />

Coat: Hi-Build Epoxy<br />

(4.0 to 6.0 mils DFT)<br />

3) Finish Series 73 Endura-Shield III<br />

Coat: Urethane<br />

or equal (2.0 to 3.0 mils DFT)<br />

Flanged fittings shall meet ANSI 21.20 and AWWA C110 <strong>standards</strong>.<br />

All fittings shall be epoxy lined.<br />

Pipe joints to be push on. The use of ductile iron pipe shall be allowed only where<br />

individually approved on a case by case basis.<br />

3. Parallel/Horizontal Separation<br />

Sanitary sewers, force mains, and storm sewers should cross under water mains whenever<br />

possible. Sanitary sewers, force mains and storm sewers crossing water mains shall be<br />

laid to provide a <strong>minimum</strong> vertical distance of 18 inches between the invert of the upper<br />

pipe and the crown of the lower pipe whenever possible.<br />

Where sanitary sewers, force mains and storm sewers must cross a water main with less<br />

than 18 inches vertical distance, both the sewer and the water main shall be constructed of<br />

ductile iron pipe (DIP) at the crossing. (Storm sewers are not required to be DIP.)<br />