12.12.2012 Views

minimum design & construction standards - Martin County, Florida

minimum design & construction standards - Martin County, Florida

minimum design & construction standards - Martin County, Florida

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

panel's control circuitry, shut down the affected pump and send a signal to the RTU.<br />

e) Pump Control Panel Housing<br />

The pump control panel housing shall be a NEMA Type 12/3R with rain-shield and 3-point<br />

padlockable latch, dead front enclosure, constructed of not less than 14 gauge #316<br />

stainless steel. The <strong>minimum</strong> panel housing shall be 12" deep x 30" wide x 36" high. The<br />

enclosure shall be equipped with an exterior door, interior “dead front” door and shall<br />

incorporate a removable 1/8 inch thick aluminum back panel on which control components<br />

shall be mounted. The front door shall be secured to the enclosure with a continuous<br />

stainless steel piano hinge and be equipped with a padlocking three point latching<br />

mechanism. The handle of the three point latching mechanism shall be fabricated of heavy<br />

gauge stainless steel. The back panel shall be secured to the enclosure with collar studs.<br />

f) Fastenings and duct work<br />

All motor branch circuit breakers, motor starter contactors, overload relays, control<br />

transformer and control relays shall be securely fastened to the removable back panel with<br />

cadmium plated steel screws and lock washers. The back panel shall be tapped to accept<br />

the component mounting screws. Self-tapping screws shall not be used to mount any<br />

component.<br />

g) Contactors and Switches<br />

An open frame, across-the-line, NEMA rated, magnetic motor contactors with 120 volt, 60<br />

Hz coils shall be furnished for each pump motor (Saftronics Model GP-10 VFDs shall be<br />

supplied in approved single phase installations). Contacts and coil shall be easily<br />

replaceable without removing the contactor from its mounted position. All operating<br />

controls and instrument shall be securely mounted on the control compartment interior<br />

door. All controls and instruments shall be clearly labeled using engraved plastic plates to<br />

indicate function. Trouble light switch shall be NEMA 4.<br />

h) Primary Disconnect<br />

The primary disconnect shall be a re-settable primary circuit breaker located in the circuit<br />

prior to the control panel. Amperage rating and stainless steel enclosure type to be<br />

specified by Engineer. Lightning arresters and surge protectors shall be installed.<br />

I) Interior<br />

The following components shall be mounted on the interior door:<br />

Access to Primary and Generator circuit breaker and interlock mechanism<br />

Access to Pump and secondary breakers.<br />

Trouble light On-Off switch.<br />

“Run in Backup” indicator light.<br />

40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!