c) Electrical Wiring<br />
1. Contractor shall utilize wiring supplied with the remote mount kit. Mount indicator<br />
(TR28) on the RCP. Wire is supplied and terminated from the meter head to the<br />
Indicator/Totalizer (TR28). Wire is also supplied to terminate at the RTU.<br />
2. Grounding<br />
Grounding system meeting a <strong>minimum</strong> resistance of 5 Ohms or less shall be<br />
installed at each transmitter location. Ground rods shall be 5/8” diameter X 8’0”<br />
copper clad steel. Connectors shall be solid copper clamps with connecting wire at<br />
least one size larger than any other wire on the same device. The number and<br />
pattern of ground rods shall be chosen to provide the required maximum resistance.<br />
d) Transmitter Indicator/Interface<br />
The flow transmitter (TR28) shall be connected to a device, the Indicator/Interface, in<br />
the Reuse Control Panel that interprets the digital signal and provides a signal that will<br />
interface with the control system and a visual display of the flow rate<br />
1. Mounting<br />
The Indicator/Interface will be supplied, installed and wired as part of the control<br />
panel by the RCP manufacturer and mounted on an inner dead-front door.<br />
2. Wiring<br />
All power supply, sensor, and interface output wiring shall be made in a work like<br />
manner conforming to the National Electric Code and local ordinances. All wiring<br />
shall be color-coded or tagged to maintain functionality and polarity. Any wire<br />
connections shall be made to screw type terminal strips using crimp on spade lug<br />
connections of the appropriate size.<br />
e) Start-up Procedure<br />
When the installation is complete, the equipment manufacturer’s representative shall<br />
verify that all the equipment has been installed and transmitter/monitors have been<br />
correctly programmed. With the system running, the equipment manufacturer’s<br />
representative verify output signals from each sensor, inputs to transmitter/monitors and<br />
correct transmitter outputs.<br />
1. A 8-hour time window (7days a week) for irrigation will be set at all site Reuse<br />
Control Panels, beginning at 10:00 PM and finished by 6:00 AM. <strong>Martin</strong> <strong>County</strong><br />
must approve any deviation from this schedule.<br />
65