A <strong>minimum</strong> 5 foot horizontal separation, pipe center to pipe center with a <strong>minimum</strong> 3 foot<br />

pipe wall to pipe wall shall be maintained between any type of sewer and reclaimed water<br />

main in parallel installations whenever possible.<br />

In cases where it is not possible to maintain a 5 foot horizontal separation, the reclaimed<br />

water main must be laid in a separate trench or on an undisturbed earth shelf located on<br />

one side of the sewer or force main at such an elevation that the bottom of the reclaimed<br />

water main is at least 18 inches above the top of the sewer.<br />

Where it is not possible to maintain a vertical distance of 18 inches in parallel installations,<br />

the reclaimed water main shall be constructed of DIP and the sewer or the force main shall<br />

be constructed of DIP (except storm sewers) with a <strong>minimum</strong> vertical distance of 12 inches.<br />

The reclaimed water main should always be above the sewer. Joints on the reclaimed<br />

water main shall be located as far apart as possible from joints on the sewer of force main<br />

(staggered joints).<br />

All DIP shall be Pressure Class 350 or higher. Adequate protective measures against<br />

corrosion shall be as determined by the <strong>design</strong> engineer and the Department.<br />

Horizontal separation of 15 feet to buildings, top of banks of lakes and canals and other<br />

structures shall be maintained, if possible. An absolute <strong>minimum</strong> of 10 feet may be allowed<br />

only when unavoidable and only with DIP.<br />

5. Layout<br />

Permanent dead ends will not be approved unless they are reasonably unavoidable. Dead<br />

ends shall be equipped with a blow-off for flushing purposes. Temporary dead-ends shall<br />

have a gate valve with a mechanical joint plug. The gate valve shall be mechanically<br />

restrained for two full joints of pipe.<br />

Reclaimed water mains should be placed in right-of-way whenever possible. Placement of<br />

the water main on or adjacent to interior property lines or between structures is<br />

discouraged and will be approved only when unavoidable or when necessary for looping.<br />

6. Reclaimed Water Main Material<br />

PVC reclaimed water mains 4 inch to 12 inch diameter (4" - 12") shall be DR-18<br />

manufactured to ductile iron pipe outside dimensions and in compliance with AWWA<br />

Standard C900. The pipe shall have an integral bell end and gasket seal with the joint in<br />

compliance with the requirements of ASTM D3139. The pipe color along with all<br />

associated appurtenances shall be Purple Pantone 522. Smaller diameter service lines<br />

(1/2” through 3”) shall be Polyethylene Pressure Pipe and Tubing or PVC (schedule 40)<br />

and shall be manufactured in compliance with ANSI/AWWA C901, PE 3408, PC 200 and<br />

DR9. The pipe color shall be Purple Pantone 522 or co-extruded Purple Pantone 522 color<br />

stripes.<br />