• Level sensing devices require an output of 4-20ma signal.<br />
Panel <strong>construction</strong> and testing will be done by the panel manufacturer.<br />
e. Standard Metering Facility Components<br />
The lake level detector shall be a Blue Ribbon Industrial Components Corporation’s Bird<br />
Cage Super Duty level sensor, model #311Z or Transicoil Submersible Transmitter, model<br />
274C or approved equal. The general/electrical contractor shall provide an appropriate<br />
power supply from the panel, a properly <strong>design</strong>ed and installed still-well and include a level<br />
indicator in the panel. The indicator shall be a Red Lion model CUB4LP.<br />
The upstream above ground manual butterfly valve shall be a flanged 150 psi hand wheel<br />
operator manufactured by Dezurik.<br />
The air/vacuum valve shall have a 2-inch diameter inlet rated at 150 psi as manufactured<br />
by Val-Matic, model 102.<br />
Rain gauge to measure rainfall shall be provided with each metering facility.<br />
17. Start-Up and Testing<br />
Developer or Engineer shall provide the following items on reclaimed water meter station<br />
start-up.<br />
a. Deed to property or plat showing easement.<br />
b. Operation and Maintenance Manuals (3 sets required).<br />
c. Meter and control equipment data and technical information concerning<br />
operation, maintenance and repair shall be supplied at the time of completion<br />
of meter station <strong>construction</strong>. Parts lists, warranties, and all other pertinent<br />
information is also required. All equipment shall be warranted by the<br />
manufacturer for one year from the date of start-up.<br />
d. Individual schematic wiring diagrams and information concerning Control<br />
Panel operation and parts replacement.<br />
e. Verification of operational approval by Manufacturer's Representative and<br />
Engineer in writing.<br />
f. Contractor shall have tested the complete system prior to final start-up.<br />
A certified factory trained representative shall be provided by the contractor for the<br />
start-up.<br />