12.01.2021 Views

UNT Dallas 2020 Master Plan

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PHASE 1B - EVENTS CENTER<br />

The development of the events center (C5) may<br />

require the construction of an additional parking<br />

structure (PS1). It is anticipated that approximately<br />

200 surface parking spaces will be lost in order to<br />

accommodate the structure. Given the relatively large<br />

footprint, the events center will require removing a<br />

portion of the existing DART pedestrian pathway<br />

to the station. This realignment (A) will occur with<br />

the concurrent development of Trailblazer Plaza<br />

(B), a centralized destination for game-day events,<br />

recreation, and school pride. The event center will be<br />

located along the promenade and close to the DART<br />

station, activating this end of the promenade.<br />

TABLE 5.2: PHASE 1B BUILDING PROGRAM<br />

ID Program Levels GSF<br />

C5 Events Center (3000 seat) - 150,000<br />

TOTAL<br />

Phase 1B Non-Building Program:<br />

A. REALIGNMENT OF CAMPUS ROADWAY<br />

B. TRAILBLAZER PLAZA<br />

150,000 gsf<br />

ID Parking Levels Spaces<br />

PS1 Parking Structure (60,000 GSF) 5 800<br />

TOTAL<br />

800 spaces<br />

<strong>2020</strong> CAMPUS MASTER PLAN 112

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!