VEHICULAR CIRCULATION<br />
Gateways<br />
The primary campus gateway will remain at the<br />
existing location on University Hills Boulevard.<br />
Additional gateways include a new significant<br />
campus entrance from Camp Wisdom Road<br />
adjacent to the planned recreational fields, as well<br />
as the three minor drives—two that are currently<br />
under construction on Camp Wisdom Road and on<br />
University Hills Boulevard to the south, intended to<br />
relieve congestion, and a DART station access drive<br />
within DART's right-of-way. Each of the secondary<br />
gateways will provide right-in, right-out access only.<br />
Service and Emergency Access<br />
A system of service and emergency access roads<br />
will be required to support campus operations and<br />
safety. Select pedestrian routes may accommodate<br />
service and emergency vehicles with larger<br />
pathway widths—shown in Figure 4.14– in dashed<br />
blue—particularly within the campus core.<br />
Secondary roads may also accommodate service<br />
and emergency vehicles.<br />
Circulation<br />
The plan establishes a primary road around the<br />
campus between the Camp Wisdom Road and<br />
DART vehicular gateways. Some realignment of the<br />
existing road will be required south of the campus<br />
core around the proposed Events Center in order to<br />
accommodate that building footprint and function.<br />
An extended primary road will allow more evenly<br />
distributed traffic, and will minimize pedestrian/<br />
vehicular conflicts. Secondary roads will link less<br />
dense sections of the campus, and will be lightly<br />
used and designed to manage access. Personal<br />
vehicles will not be permitted in the campus core<br />
to preserve a pedestrian-priority area, while still<br />
accommodating accessible vehicle access.<br />
<strong>2020</strong> CAMPUS MASTER PLAN 74