FIGURE 2.11: BUILDABLE LAND ANALYSIS<br />
CAMP WISDOM RD<br />
Steep<br />
Slopes<br />
Area-B<br />
Existing Wastewater Line<br />
Steep<br />
Slopes<br />
UNIVERSITY HILLS BLVD<br />
Area-A<br />
Isolated<br />
Area<br />
<strong>Dallas</strong><br />
Water<br />
Utility<br />
Area-C<br />
72" Water Line<br />
Overhead Powerlines<br />
DART BLUE LINE<br />
Area-D<br />
Area-E<br />
Isolated<br />
Area<br />
DART<br />
<strong>UNT</strong> <strong>Dallas</strong><br />
Station<br />
INFRASTRUCTURE<br />
10' CONTOURS<br />
2' CONTOURS<br />
SUB-AREAS<br />
MODERATE SLOPES<br />
STEEP SLOPES<br />
ISOLATED AREAS<br />
<strong>2020</strong> CAMPUS MASTER PLAN 36