VGB POWERTECH 5 (2021) - International Journal for Generation and Storage of Electricity and Heat
VGB PowerTech - International Journal for Generation and Storage of Electricity and Heat. Issue 5 (2021). Technical Journal of the VGB PowerTech Association. Energy is us! Nuclear power. Nuclear power plants - operation and operation experiences
VGB PowerTech - International Journal for Generation and Storage of Electricity and Heat. Issue 5 (2021).
Technical Journal of the VGB PowerTech Association. Energy is us!
Nuclear power. Nuclear power plants - operation and operation experiences
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Industry News <strong>VGB</strong> PowerTech 5 l <strong>2021</strong><br />
Industry<br />
News<br />
Company<br />
Announcements<br />
ANDRITZ to rehabilitate the<br />
hydraulic passages at Carillon<br />
generating station, Canada<br />
(<strong>and</strong>ritz) ANDRITZ has been awarded a<br />
contract by Hydro-Québec, Canada, to rehabilitate<br />
the hydraulic passages <strong>of</strong> the Carillon<br />
generating station located on the<br />
Ottawa River, Canada.<br />
This order follows the recent contract<br />
from Hydro-Québec <strong>for</strong> the first phase to<br />
complete the re-equipment <strong>of</strong> six 54-MW<br />
turbine/generator units <strong>of</strong> this plant. Realization<br />
<strong>of</strong> this additional project will span<br />
over seven years.<br />
The first part <strong>of</strong> the contract comprises all<br />
work related to the design, manufacture<br />
<strong>and</strong> installation <strong>of</strong> hydro-mechanical<br />
equipment required <strong>for</strong> the repair <strong>and</strong> / or<br />
replacement <strong>of</strong> six hydraulic passages (including<br />
civil mechanical work), 18 new intake<br />
gates (6 m x 10 m), 18 sets <strong>of</strong> new embedded<br />
guides (25 m), rehabilitation <strong>of</strong> 18<br />
trash racks (6 m x 20 m), as well as 18 new<br />
hydraulic hoist systems.<br />
With this additional contract, ANDRITZ<br />
Hydro Canada not only proves its strong<br />
relationship with Hydro-Québec, but also<br />
demonstrates its ability to <strong>of</strong>fer integrated<br />
rehabilitation solutions covering all components<br />
related to production <strong>of</strong> hydroelectric<br />
power.<br />
LL<br />
www.<strong>and</strong>ritz.com (211571245)<br />
ANDRITZ to supply a new HERB<br />
recovery boiler <strong>for</strong> Billerud<br />
Korsnäs’ mill in Frövi, Sweden<br />
(<strong>and</strong>ritz) ANDRITZ has received an order<br />
from BillerudKorsnäs to supply a HERB recovery<br />
boiler <strong>for</strong> its mill in Frövi, Sweden.<br />
The new boiler will replace the existing<br />
recovery boiler that has been in operation<br />
in Frövi since 1969.<br />
The ANDRITZ scope <strong>of</strong> supply includes a<br />
HERB recovery boiler designed <strong>for</strong> the current<br />
pulp production level, but also to support<br />
a future black liquor combustion capacity<br />
<strong>of</strong> 1,670 tds/d <strong>and</strong> with future steam<br />
parameters <strong>of</strong> 100 bar <strong>and</strong> 505 °C to maximize<br />
power generation.<br />
ANDRITZ will also supply a high-density<br />
concentrator solution to increase the black<br />
liquor concentration. This will improve operation<br />
<strong>and</strong> increase power generation by<br />
the HERB recovery boiler at Frövi mill even<br />
further.<br />
Richard Morén, Mill Director, Billerud-<br />
Korsnäs Frövi, says: “We have been very<br />
pleased with the co-operation with AN-<br />
DRITZ during the sales phase, <strong>and</strong> selection<br />
<strong>of</strong> the recovery boiler supplier is an<br />
important step in our Frövi investment project.<br />
We are looking <strong>for</strong>ward to working in<br />
co-operation with the entire ANDRITZ<br />
team during the project phase.”<br />
Henrik Wikstedt, Vice President, Recovery<br />
Boilers, ANDRITZ, says: “We are very<br />
proud that BillerudKorsnäs has placed its<br />
trust in the ANDRITZ team <strong>and</strong> our technical<br />
solutions. Both the sales process <strong>and</strong><br />
the collaboration between our teams were<br />
good right from the beginning. As a result,<br />
we have gathered an excellent underst<strong>and</strong>ing<br />
<strong>of</strong> BillerudKorsnäs’ business drivers<br />
<strong>and</strong> targets.”<br />
LL<br />
www.<strong>and</strong>ritz.com (211571246)<br />
Carillon generating station, located on the Ottawa River, Canada © Hydro-Québec<br />
Bilfinger exp<strong>and</strong>s cooperation<br />
with Saudi <strong>Electricity</strong> Company<br />
• Inspection <strong>and</strong> maintenance at two<br />
power plants in Saudi Arabia<br />
• Three-year extension <strong>of</strong> cooperation in<br />
place since 2013 at Ghazlan Power plant<br />
• New contract with base term <strong>of</strong> six years<br />
awarded at Shuqaiq Power plant<br />
• Combined order volume <strong>of</strong> ~€35<br />
million with option to exp<strong>and</strong> volume<br />
up to €62 million<br />
(bilfinger) Bilfinger‘s cooperation with<br />
Saudi <strong>Electricity</strong> Company (SEC), the Saudi<br />
Arabian electric energy company, has<br />
been extended by a further three years in<br />
Ghazlan Power plant <strong>and</strong> a similar new<br />
contract with base term <strong>of</strong> six years has<br />
been awarded <strong>for</strong> Shuqaiq Power plant.<br />
Some 300 employees <strong>of</strong> Bilfinger Babcock<br />
Borsig Service Arabia Ltd. are deployed at<br />
these plants to carry out maintenance <strong>and</strong><br />
repair activities. The order, with a minimum<br />
combined volume <strong>of</strong> around € 35<br />
million <strong>and</strong> expansion options that could<br />
raise the total to up to € 62 million, will be<br />
booked in the Engineering & Maintenance<br />
<strong>International</strong> segment <strong>of</strong> Bilfinger.<br />
“It is always a special honor <strong>for</strong> us as a<br />
service provider when an important customer<br />
like SEC is so satisfied with our services<br />
that they once again place their trust<br />
in us. Not only are we extending our cooperation<br />
at the Ghazlan power plant, but we<br />
are also exp<strong>and</strong>ing our cooperation to execute<br />
similar work at the Shuqaiq power<br />
plant,” says Christian Rugl<strong>and</strong>, Acting Executive<br />
President <strong>of</strong> Bilfinger Middle East.<br />
Bilfinger is responsible <strong>for</strong> the inspection<br />
<strong>and</strong> maintenance <strong>of</strong> various plant components<br />
at the power plants. The scope <strong>of</strong> services<br />
includes, among other things, the repair<br />
<strong>of</strong> deaerators, steam drums, boiler<br />
ducts, boiler casings, blowdown <strong>and</strong> flash<br />
tank test <strong>and</strong> the repair <strong>of</strong> burners <strong>and</strong><br />
burner gas valves <strong>and</strong> actuators, repairs at<br />
sea water intake areas, various valves<br />
across the plant <strong>and</strong> other auxiliary equipment.<br />
Bilfinger has been conducting maintenance<br />
<strong>and</strong> repair work at the Ghazlan<br />
power plant since 2013. SEC has now extended<br />
the contract <strong>for</strong> this work by three<br />
years. Similar work at the power plant in<br />
Shuqaiq has now been added.<br />
The natural gas-fired power plant in Ghazlan<br />
is located almost 60 kilometers north<br />
<strong>of</strong> Dammam on the east coast <strong>of</strong> Saudi Arabia.<br />
With a capacity <strong>of</strong> 4,000 MW, it is the<br />
largest power plant in the Middle East region.<br />
SEC‘s Shuqaiq power plant is located<br />
on the west coast <strong>of</strong> Saudi Arabia, about<br />
600 kilometers south <strong>of</strong> Jeddah. The integrated<br />
power plant includes facilities <strong>for</strong><br />
generating electricity from heavy crude oil<br />
as well as seawater desalination plants <strong>and</strong><br />
has a total capacity <strong>of</strong> 2,880 MW.<br />
LL<br />
www.bilfinger.com (211571249)<br />
16