08.06.2021 Views

VGB POWERTECH 5 (2021) - International Journal for Generation and Storage of Electricity and Heat

VGB PowerTech - International Journal for Generation and Storage of Electricity and Heat. Issue 5 (2021). Technical Journal of the VGB PowerTech Association. Energy is us! Nuclear power. Nuclear power plants - operation and operation experiences

VGB PowerTech - International Journal for Generation and Storage of Electricity and Heat. Issue 5 (2021).
Technical Journal of the VGB PowerTech Association. Energy is us!
Nuclear power. Nuclear power plants - operation and operation experiences

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Nuclear power plants: Operating results <strong>VGB</strong> PowerTech 5 l <strong>2021</strong><br />

Plants in direct exchange <strong>of</strong> experience with <strong>VGB</strong> I March <strong>2021</strong><br />

Nuclear<br />

power plant<br />

Country<br />

Type<br />

Nominal<br />

capacity<br />

Gross Net<br />

MW MW<br />

Operating<br />

time<br />

generator<br />

in h<br />

Energy generated<br />

(gross generation) MWh<br />

Month Year 1 commis-<br />

Since<br />

sioning<br />

Time Unit capability<br />

availability % factor %*<br />

Energy unavailability<br />

%*<br />

Energy<br />

utilisation %*<br />

1 1 Postponable Not postponable Month Year 1<br />

Planned** Unplanned***<br />

Month Year Month Year<br />

Month Year 1<br />

Month Year 1 Month Year 1<br />

GKN-II Neckarwestheim DE PWR 1400 1310 743 1 029 210 3 011 700 354 363 244 100.00 100.00 100.00 99.98 0 0.02 0 0 0 0 99.28 99.94 -<br />

KBR Brokdorf DE PWR 1480 1410 743 1 011 793 2 974 520 374 237 849 100.00 100.00 99.96 99.96 0.03 0.04 0 0 0.01 0 91.81 92.90 -<br />

KKE Emsl<strong>and</strong> DE PWR 1406 1335 743 1 044 433 3 052 820 372 063 521 100.00 100.00 100.00 100.00 0 0 0 0 0 0 100.12 100.72 4<br />

KKI-2 Isar DE PWR 1485 1410 743 1 082 714 3 190 736 380 619 779 100.00 100.00 100.00 99.99 0 0.01 0 0 0 0 97.82 99.28 -<br />

KRB-C Gundremmingen DE BWR 1344 1288 743 1 004 664 2 920 070 353 397 836 100.00 100.00 100.00 99.84 0 0.16 0 0 0 0 99.91 99.95 -<br />

KWG Grohnde DE PWR 1430 1360 458 635 604 2 577 714 401 338 063 61.62 86.79 61.08 86.52 38.92 13.40 0 0.07 0 0.01 59.54 83.10 1,2<br />

OL1 Olkiluoto FI BWR 920 890 743 688 592 2 002 084 279 036 801 100.00 100.00 99.94 99.92 0.06 0.06 0 0.01 0 0 100.74 100.80 4<br />

OL2 Olkiluoto FI BWR 920 890 743 688 098 2 001 173 268 903 895 100.00 100.00 99.88 99.93 0.12 0.07 0 0 0 0 100.66 100.75 -<br />

KCB Borssele NL PWR 512 484 743 379 756 1 096 756 173 165 553 100.00 99.99 100.00 99.99 0 0.01 0 0 0 0 100.03 99.39 -<br />

KKB 1 Beznau CH PWR 380 365 743 284 678 828 555 134 039 941 100.00 100.00 100.00 100.00 0 0 0 0 0 0 100.86 101.03 7<br />

KKB 2 Beznau CH PWR 380 365 743 282 606 822 130 141 198 431 100.00 100.00 100.00 100.00 0 0 0 0 0 0 100.14 100.23 7<br />

KKG Gösgen CH PWR 1060 1010 743 791 017 2 253 230 333 139 819 100.00 98.36 99.67 97.64 0.04 0.03 0.28 2.33 0 0 100.44 98.46 7<br />

CNT-I Trillo ES PWR 1066 1003 743 786 409 1 987 770 266 011 618 100.00 88.13 100.00 87.97 0 0 0 0 0 12.03 98.84 85.83 -<br />

Dukovany B1 CZ PWR 500 473 743 368 466 563 220 120 207 659 100.00 53.73 99.00 52.16 0 7.78 0 0 1.00 40.06 99.18 52.17 -<br />

Dukovany B2 CZ PWR 500 473 743 369 074 1 072 748 115 684 662 100.00 100.00 100.00 99.83 0 0.17 0 0 0 0 99.35 99.37 -<br />

Dukovany B3 CZ PWR 500 473 743 366 413 1 065 564 114 426 121 100.00 100.00 99.78 99.87 0.22 0.13 0 0 0 0 98.63 98.71 -<br />

Dukovany B4 CZ PWR 500 473 0 0 508 214 115 074 116 0 47.24 0 47.09 100.00 52.91 0 0 0 0 0 47.08 -<br />

Temelin B1 CZ PWR 1082 1032 621 673 607 2 213 479 131 784 769 83.58 94.35 83.40 94.28 16.60 5.72 0 0 0 0 83.79 94.75 -<br />

Temelin B2 CZ PWR 1082 1032 743 818 178 2 379 438 127 968 342 100.00 100.00 100.00 100.00 0 0 0 0 0 0 101.40 101.48 -<br />

Doel 1 BE PWR 454 433 743 354 100 1 028 813 141 042 654 99.98 99.88 99.98 99.87 0.02 0.13 0 0 0 0 102.35 102.31 -<br />

Doel 2 BE PWR 454 433 620 288 990 958 365 139 568 430 82.87 94.10 82.87 94.09 17.13 5.91 0 0 0 0 83.23 94.97 2<br />

Doel 3 BE PWR 1056 1006 743 796 788 2 329 183 273 541 493 99.73 99.91 99.73 99.91 0 0 0 0 0.27 0.09 101.02 101.65 -<br />

Doel 4 BE PWR 1086 1038 743 815 562 2 374 619 279 734 608 100.00 100.00 100.00 100.00 0 0 0 0 0 0 99.77 99.97 -<br />

Tihange 1 BE PWR 1009 962 743 752 346 2 198 568 310 065 544 99.77 99.92 99.77 99.91 0.01 0 0 0 0.22 0.09 100.63 101.20 -<br />

Tihange 2 BE PWR 1055 1008 743 786 229 1 676 822 267 380 638 100.00 73.51 100.00 73.51 0 3.02 0 0 0 23.47 101.35 74.24 -<br />

Tihange 3 BE PWR 1089 1038 743 803 569 2 334 916 288 988 575 99.99 99.99 99.99 99.98 0.01 0.02 0 0 0 0 99.88 99.88 -<br />

Remarks<br />

1<br />

PWR: Pressurised water reactor<br />

Beginning <strong>of</strong> the year<br />

2<br />

BWR: Boiling water reactor<br />

Final data were not yet available in print<br />

* Net-based values (Czech <strong>and</strong> Swiss nuclear power plants gross-based)<br />

** Planned: the beginning <strong>and</strong> duration <strong>of</strong> unavailability have to be determined more than 4 weeks be<strong>for</strong>e commencement<br />

*** Unplanned: the beginning <strong>of</strong> unavailability cannot be postponed or only within 4 weeks.<br />

All values were entered in the column not postponable.<br />

– Postponable: the beginning <strong>of</strong> unavailability can be postponed more than 12 hours to 4 weeks.<br />

– Not postponable: the beginning <strong>of</strong> unavailability cannot be postponed or only within 12 hours.<br />

Remarks:<br />

1 Refuelling<br />

2 Inspection<br />

3 Repair<br />

4 Stretch-out-operation<br />

5 Stretch-in-operation<br />

6 Here<strong>of</strong> traction supply:<br />

7 Here<strong>of</strong> steam supply:<br />

KKB 1 Beznau<br />

Month: <br />

2,746 MWh<br />

Since the beginning <strong>of</strong> the year: 9,761 MWh<br />

Since commissioning: 576,743 MWh<br />

KKB 2 Beznau<br />

Month:<br />

0 MWh<br />

Since the beginning <strong>of</strong> the year: 163 MWh<br />

Since commissioning: 134,917 MWh<br />

KKG Gösgen<br />

Month:<br />

8,597 MWh<br />

Since the beginning <strong>of</strong> the year:23,630 MWh<br />

Since commissioning: 2,490,557 MWh<br />

8 New nominal capacity since January <strong>2021</strong><br />

88