Report on Departmental Objectives<br />
February 3, 2011<br />
Page 7<br />
WASTEWATER RECLAMATION FACILITY (WRF)<br />
The primary and continuing goals <strong>of</strong> the Wastewater Reclamation Facility are as follows:<br />
WRF Improvements - Construction on the WRF is under way. On Monday, January 11, 2011 the<br />
<strong>Village</strong> hosted a preconstruction meeting held at the <strong>Village</strong> Hall Board room. In attendance was <strong>Village</strong><br />
staff, Strand, JJ Henderson and many the subcontractors working on the project.<br />
Aeration Blower/Motor #2 Rehabilitation - This Project is to rehabilitate the blower and motor to<br />
maintain treatment until the new plant is constructed. This project was approved by the Board and<br />
completed.<br />
Automatic Power Transfer Switch Installation, <strong>Deerfield</strong> Road Storm/Lift Station - This project is to<br />
replace the existing obsolete power transfer switch at <strong>Deerfield</strong> Road Station with the existing switch at<br />
the W.R.F. when the new construction takes that existing switch out <strong>of</strong> service. This project will be<br />
completed by early spring.<br />
Door Replacement, Warwick Road Storm Station - The purpose <strong>of</strong> this project is to replace several<br />
deteriorated doors at this location. This project has been completed.<br />
Ro<strong>of</strong> Replacement: <strong>Deerfield</strong> Rd., Warwick Rd., and Wilmot Stations - The purpose <strong>of</strong> this project is<br />
to replace the ro<strong>of</strong>s and related work at these three <strong>Village</strong> Facilities. This project has been completed.<br />
Annual Bio-solids Hauling and Land Application – Proposals were requested from three companies for<br />
this work - Stewart Spreading, Dahm Trucking and Synagro. This work consists <strong>of</strong> loading, hauling and<br />
land application <strong>of</strong> bio-solids. Stewart Spreading provided the lowest proposal to perform the work and<br />
they completed this work in fall, 2010.<br />
Deerbrook Mall Sanitary Lift Station Replacement - Issues related to parking spaces and easements<br />
have been resolved. The project has gone before the Planning Commission and Appearance Review<br />
Commission. This project will be bid in February with construction starting early spring.<br />
Telemetry, Reservoir 29A - Staff was informed by M.W.R.D. that the contract for telemetry at 29A was<br />
advertised on May 20, 2010 and bids were opened on July 14, 2010. 29A is one <strong>of</strong> eleven sites in their<br />
contract. Work is expected to be completed by the end <strong>of</strong> 2011. The estimated cost (per agreement) to<br />
<strong>Deerfield</strong> for this telemetry is $25,000. However, it is not clear at this point if payment will be due this<br />
budget year or next.<br />
SEWER DEPARTMENT<br />
The primary and continuing goals <strong>of</strong> the Sewer Department are as follows:<br />
To continue to maintain, clean, and repair the sanitary and storm sewer systems and be able to<br />
respond effectively and efficiently to emergency situations – Sewer department continues to maintain<br />
both sanitary and storm sewer systems through out the village.