29.01.2013 Views

02.07.2011 - Village of Deerfield

02.07.2011 - Village of Deerfield

02.07.2011 - Village of Deerfield

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

the GAF/ELK Timberline architectural shingle (see exhibit 6 in petitioner’s<br />

materials). They endorsed the proposed shingle as a suitable material, and from<br />

an aesthetic point they believed the Timberline shingles blend very well with the<br />

brick exterior <strong>of</strong> the buildings. A material sample <strong>of</strong> the proposed asphalt<br />

shingle to be used was presented at the Plan Commission meeting. The South<br />

Commons development located to the north and northwest <strong>of</strong> the Coromandel<br />

development uses an asphalt shingle ro<strong>of</strong> and they do not object to the use <strong>of</strong> an<br />

asphalt shingle ro<strong>of</strong> for the Coromandel townhomes.<br />

Zoning Conformance<br />

Request for a finding <strong>of</strong> a substantial conformance<br />

Changes to an approved planned unit development (PUD) requires Plan<br />

Commission consideration and must ultimately be approved by the Board <strong>of</strong><br />

Trustees. The exterior finishes that were constructed in this development are the<br />

approved exterior finishes, and a change to the ro<strong>of</strong> exterior material requires<br />

<strong>Village</strong> approval. According to Article 12.09-G <strong>of</strong> the Zoning Ordinance: “Any<br />

subsequent change or addition to an approved a final development plan shall first<br />

be submitted for approval to the Plan Commission and, if in the Plan<br />

Commission’s opinion, such change or addition is not substantial, it may<br />

recommend approval to the <strong>Village</strong> Board without a hearing. If such a change or<br />

addition is construed to be substantial, a public hearing shall be held prior to<br />

such recommendation.”<br />

If the Plan Commission recommends that the proposed change to the planned<br />

unit development is found to be in substantial conformance with the previous<br />

plan and the Board <strong>of</strong> Trustees agrees, a public hearing will not be required to<br />

amend the plan.<br />

The request for a finding <strong>of</strong> substantial conformance avoids the cost and time <strong>of</strong><br />

a public hearing. The petitioners would like to start on the ro<strong>of</strong> replacement<br />

project in the spring as the weather will allow. Past requests that were approved<br />

by substantial conformance include:<br />

A change to the sign plan for Stoney River Legendary Steakhouse to allow an<br />

increase in the size <strong>of</strong> the sign.<br />

A change in the parking lot at Hyatt <strong>Deerfield</strong> Road campus (the Hyatt Hotel and<br />

102, 104, 106, and 108 Wilmot Road <strong>of</strong>fice building) to add parking spaces to the<br />

property.<br />

A change in the Takeda tollway sign to allow for a larger ground sign along the<br />

tollway.<br />

2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!