4 foot depth of precast manhole section with reinforced walls, top section,<br />

manhole frame and cover, extension collars, manhole steps, vent piping, piping,<br />

valves, access manway, pipeline marker post, and all other appurtenant work<br />

not included under other bid items.<br />

1.4.2. 90 Inch ID Manhole, Additional Depth. This unit price shall cover the<br />

entire cost of each additional foot of vertical manhole depth in excess of 4 feet<br />

including the cost for the precast section, excavation, backfill and the prorated<br />

cost of manhole steps.<br />

1.5. Blowoff Assemblies. The following blowoff assemblies and additional depth<br />

shall be paid for at the unit price bid.<br />

1.5.1. Blowoff Assembly. Each blowoff assembly shall be paid for at the unit<br />

price bid and shall include all excavation and backfilling not paid for as trenching<br />

for pipe, 8 foot depth of precast manhole sections with reinforced walls and base,<br />

top section, manhole frame and cover, extension collars, manhole steps, piping<br />

including additional cost for tangential tee, valves and valve boxes, pipeline<br />

marker post, and all other appurtenant work not included under other bid items.<br />

1.5.2. 4 Foot ID Manhole Additional Depth. This unit price shall cover the<br />

entire cost of each additional foot of vertical manhole depth in excess of 8 feet,<br />

including the cost for the precast section, excavation, backfill and the prorated<br />

cost of manhole steps.<br />

1.6. Buried Line Valve Assembly. Each buried line valve assembly shall be paid<br />

for at the unit price bid and shall include all excavation and backfilling not paid for<br />

as trenching for pipe, valve, valve box, jointing materials including gaskets and<br />

flange bolts, megalugs, appurtenances, and all other appurtenant work not<br />

included under other bid items.<br />

1.7. Electrical and Communications. The following items shall be paid for at the<br />

unit price.<br />

1.7.1. 2 Inch PVC Conduit. The unit price bid for this item shall include the<br />

2 inch conduit and additional trench excavation, bedding, and backfill not paid for<br />

under other items and communication hand holes as specified. The conduit shall<br />

be measured for payment horizontally along the longitudinal center line of the<br />

enclosing conduit.<br />

(<strong>CPNMD</strong> )<br />

(INTERCONNECT PIPELINE ) 01025<br />

(167558.0200 ) -4-<br />

(08/01/<strong>12</strong> )