All concrete which is required in connection with manholes or structures,<br />

pavement or sidewalk replacement, and other pay items shall be included<br />

in the lump sum or unit price bid for the pay item.<br />

The unit price bid for miscellaneous concrete shall include concrete, reinforcing<br />

steel, forms, finishing, curing, and all other work or materials required to complete<br />

the concrete work.<br />

9. FENCING. Fencing required for safety and removal and replacement of right<br />

of way fencing will be measured for payment as the actual linear footage of<br />

fencing within the limits as indicated or specified.<br />

9.1. Orange Safety Fence. The unit price bid for this item shall be for installing<br />

along the pipeline alignment as shown on the drawings. Cost shall include all<br />

required appurtenances for installation and maintenance during construction<br />

duration as detailed and specified.<br />

9.2. Right of Way Fence. The unit price bid for this item shall be for removal and<br />

replacement along the pipeline alignment in areas where existing Right of Way<br />

fencing is defining the edge of the right of way as shown on the drawings. Cost<br />

shall include all required appurtenances for removal and installation once<br />

contactor operations have finished in that area.<br />

End of Section<br />

(<strong>CPNMD</strong> )<br />

(INTERCONNECT PIPELINE ) 01025<br />

(167558.0200 ) -<strong>12</strong>-<br />

(08/01/<strong>12</strong> )