All costs involved in repairing or removal and replacement of existing asphalt<br />

where damaged during the construction operations, shall be considered a<br />

subsidiary obligation of Contractor and shall be borne by Contractor.<br />

3. FLOWABLE FILL (CLSM). The unit price bid for flowable fill (CLSM) shall<br />

include backfilling trench above the embedment with flowable fill as specified and<br />

shown on the drawings.<br />

4. TRENCH STABILIZATION MATERIAL. The unit price bid for trench<br />

stabilization material shall include the excavation and disposal of the unsuitable<br />

material as directed by District Representative, and cost for furnishing, installing,<br />

and compacting rock for trench stabilization. Approved material used to stabilize<br />

the subgrade shall be measured for payment by the ton as evidenced by weight<br />

tickets for each truckload or fraction thereof.<br />

5. TRAFFIC CONTROL AND SIGNAGE. The lump sum price bid for traffic<br />

control and signage shall include the development of all required traffic control<br />

plans and signage, the implementation and maintenance of all traffic control<br />

devices and procedures, and providing personnel for flagging operations when<br />

required.<br />

6. GRADING, EROSION, AND SEDIMENT CONTROL (GESC). The unit price<br />

bid items for GESC’s shall include costs for planning, permitting, installation, and<br />

maintenance of an erosion control system for the Transmission and Distribution<br />

System pipelines. The cost shall also include maintenance of the erosion control<br />

system for the duration of the project.<br />

6.1. Erosion Control Blanket. The unit price bid for this item shall be for<br />

installing along the pipeline alignment as shown on the drawings. Cost shall<br />

include all required appurtenances from the general GESC details and<br />

specifications.<br />

6.2. Inlet Protection. The unit price bid for this item shall be for installing along<br />

the pipeline alignment as shown on the drawings. Cost shall include all required<br />

appurtenances from the general GESC details and specifications.<br />

6.3. Reinforced Rock Berm. The unit price bid for this item shall be for installing<br />

along the pipeline alignment as shown on the drawings. Cost shall include all<br />

required appurtenances from the general GESC details and specifications.<br />

6.4. RRB for Culvert Protection. The unit price bid for this item shall be for<br />

installing along the pipeline alignment as shown on the drawings. Cost shall<br />

include all required appurtenances from the general GESC details and<br />

specifications.<br />

(<strong>CPNMD</strong> )<br />

(INTERCONNECT PIPELINE ) 01025<br />

(167558.0200 ) -10-<br />

(08/01/<strong>12</strong> )