1.14.1. Serena Connection, <strong>12</strong> Inch <strong>Pipeline</strong>, Station 7+45±. The unit price bid<br />

for this item is for the connection to the existing distribution system.<br />

1.14.2. Hidden Point Connection, <strong>12</strong> Inch <strong>Pipeline</strong>, Station 3+35±. The unit price<br />

bid for this item is for the connection to the existing distribution system.<br />

1.14.3. Monarch Connection, <strong>12</strong> Inch <strong>Pipeline</strong>, Station 7+92±. The unit price bid<br />

for this item is for the connection to the existing distribution system.<br />

1.14.4. Monarch Connection, 8 Inch <strong>Pipeline</strong>, Station 3+92±. The unit price bid<br />

for this item is for the connection to the existing well pipe system.<br />

1.15. Pressure Reducing Valve Vaults. The following items shall be paid for at<br />

a lump sum bid price and shall include all excavation and backfilling, granular fill,<br />

filter fabric, reinforced cast-in-place or precast concrete walls and base, rigid<br />

insulation on interior of vault, top section including lifting eyes and access hatch<br />

frame, manhole steps or ladder, vent piping, piping, bypass piping, valves,<br />

electrical, I&C and all other appurtenant work as shown on the drawings and not<br />

included under other bid items. The cost for the pipe inside the vault and on<br />

either side of the vault up to and including the buried reducers and the butterfly<br />

valves shall be included in this bid item.<br />

1.15.1. Pressure Reducing Valve Vault No. 1 (Serena), Station 6+62±.<br />

Assembly shall be paid for at the unit price bid.<br />

1.15.2. Pressure Reducing Valve Vault No. 2 (Hidden Point), Station 2+30±.<br />

Assembly shall be paid for at the unit price bid.<br />

1.15.3. Pressure Reducing Valve Vault No. 3 (Monarch), Station 7+05±.<br />

Assembly shall be paid for at the unit price bid.<br />

1.16. Fire Hydrants. The following items shall be paid for at a lump sum bid<br />

price and shall include all excavation, piping, valves, gravel pack, reinforced castin-place<br />

concrete, and all other appurtenant work required on the drawings and<br />

not included under other bid items.<br />

1.16.1. Fire Hydrant (Serena), Station 6+25±. Assembly shall be paid for at the<br />

unit price bid.<br />

1.16.2. Fire Hydrant (Hidden Point), Station 2+00±. Assembly shall be paid for<br />

at the unit price bid.<br />

1.16.3. Fire Hydrant (Monarch), Station 6+80±. Assembly shall be paid for at the<br />

unit price bid.<br />

(<strong>CPNMD</strong> )<br />

(INTERCONNECT PIPELINE ) 01025<br />

(167558.0200 ) -7-<br />

(08/01/<strong>12</strong> )