11.02.2013 Views

CPNMD Interconnect Pipeline Specs 8-1-12 - Garney Construction

CPNMD Interconnect Pipeline Specs 8-1-12 - Garney Construction

CPNMD Interconnect Pipeline Specs 8-1-12 - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 01400<br />

QUALITY CONTROL<br />

1. TESTING SERVICES. Contractor shall provide testing services in<br />

accordance with the Contract Documents. All tests to determine compliance with<br />

the Contract Documents shall be performed by an independent commercial<br />

testing firm acceptable to Engineer. The testing firm's laboratory shall be staffed<br />

with experienced technicians, properly equipped and fully qualified to perform the<br />

tests in accordance with the specified standards.<br />

Testing services provided by Owner are for the sole benefit of Owner; however,<br />

test results shall be available to Contractor. Testing necessary to satisfy Contractor's<br />

internal quality control procedures shall be the sole responsibility of<br />

Contractor.<br />

1.01. Testing Services Provided by Contractor. Unless otherwise specified,<br />

Contractor shall provide all testing services in connection with the following:<br />

Concrete materials and trial batch mixtures.<br />

Masonry units and masonry grout and mortar materials and design<br />

mixtures.<br />

Asphaltic concrete materials and design mixtures.<br />

Embedment, fill, and backfill materials.<br />

All other tests and engineering data required for Engineer's review of<br />

materials and equipment proposed to be used in the Work.<br />

Contractor shall obtain Engineer's acceptance of the testing firm before having<br />

services performed, and shall pay all costs for these testing services.<br />

1.02. Testing Services and Special Inspections Provided by Owner. Unless<br />

otherwise specified, Owner shall provide for tests made on the following<br />

materials and equipment:<br />

Concrete.<br />

Tests of masonry prisms.<br />

Field control test of masonry.<br />

(<strong>CPNMD</strong> )<br />

(INTERCONNECT PIPELINE ) 01400<br />

(167558.0200 ) -1-<br />

(08/01/<strong>12</strong> )

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!