protection. Offsite storage facilities shall be accessible to District and District<br />

Representative.<br />

5. SUBSTITUTES AND "OR-EQUAL" ITEMS. Provisions for evaluation of<br />

substitutes and "or-equal" items of materials and equipment are covered in<br />

Section 6 of the General Conditions. Requests for review of equivalency will not<br />

be accepted by District Representative from anyone except Contractor, and such<br />

requests will not be considered until after the Effective Date of the Agreement.<br />

6. PREPARATION FOR SHIPMENT. All materials shall be suitably packaged<br />

to facilitate handling and protect against damage during transit and storage.<br />

Painted surfaces shall be protected against impact, abrasion, discoloration, and<br />

other damage. All painted surfaces which are damaged prior to acceptance of<br />

equipment shall be repainted to the satisfaction of District Representative.<br />

Each item, package, or bundle of material shall be tagged or marked as identified<br />

in the delivery schedule or on the Shop Drawings. Complete packing lists and<br />

bills of material shall be included with each shipment.<br />

7. SALVAGE OF MATERIALS AND EQUIPMENT. Existing materials and<br />

equipment removed shall become Contractor's property.<br />

8. LAND FOR CONSTRUCTION PURPOSES. Contractor will be permitted<br />

to use available land belonging to District, on or near the Site, for construction<br />

purposes and for storage of materials and equipment.<br />

The locations and extent of the areas so used shall be as indicated on the<br />

Drawings.<br />

Contractor shall immediately move stored materials or equipment if any occasion<br />

arises, as determined by District, requiring access to the storage area. Materials<br />

or equipment shall not be placed on the property of District until District has<br />

agreed to the location to be used for storage.<br />

9. EASEMENTS AND RIGHTS-OF-WAY. The easements and rights-of-way for<br />

the pipelines will be provided by District. Contractor shall confine its construction<br />

operations within the limits indicated on the Drawings. Contractor shall use due<br />

care in placing construction tools, equipment, excavated materials, and pipeline<br />

materials and supplies in order to avoid damage to property and interference with<br />

traffic.<br />

9.01. On Private Property. Easements across private property are indicated on<br />

the Drawings. Contractor shall set stakes to mark the boundaries of construction<br />

(<strong>CPNMD</strong> )<br />

(INTERCONNECT PIPELINE ) 01015<br />

(167558.0200 ) -2-<br />

(08/01/<strong>12</strong> )