detained and later was adopted and has prevailed to this day. Later it was built Hrastnik shaft 1, which is a mine<br />

opened up to Level VII. horizons to +87. The newest facility is shaft Hrastnik 2, which extends to K-12 to XI<br />

horizon.<br />

Mining method<br />

The principle of the open pit coal layer conditioned location. Hrastnik mine was split vertically in the main<br />

horizons, which were typically spaced up to 50 m. The space between horizons was divided into removal of<br />

earth floors. Between the horizons of the cave area divided into removal of earth floors, which are related to the<br />

horizon shafts or sloping lines. These are decline shafts or incline shafti. Upper horizons, and the main horizons<br />

lines were used for the delivery of material, and Hike team for ventilation.<br />

Lower horizon, or below horizon lines were used to transport coal to fresh air at floor level and removal of earth<br />

to mine water drainage. At the lowest part of the horizon of the pumping station was built. The amount of<br />

excavation floors, which were located between the horizons, was dependent on the mining method used<br />

primarily on the amount of excavation.In cross-mining method, the amount of floors is up from 3 m to 5m.<br />

When using long fase mining method of demolition, the floor height is varied from 3 m up to 15 m. In Hrastnik<br />

mine due to the security level used in the floors long fase mining method with the demolition of most up to 10<br />

m.<br />

Lateral removal of earth chamber method<br />

found expression Hrastnik break.<br />

Hrastnik layer was compared with Ojstro at the turn pushed into the depths. The results of geological research<br />

stratum, we have intensively carried out in 1980-1990 showed that the presence of coal up to the level -200 m.<br />

Stratum Hrastnik coal in the west-east, the east entry to the cave Dol in the pit and the most easterly Lasko. A<br />

layer of coal, which stretched all the way to the surface, decreasing with depth to the south. Width of the coal<br />

ranged from 25 m to 50 m layer is stretched all the way from the surface to a depth of up to level. 235 and was<br />

more or less unchanged in size and shape. From the level 235, the class size is significantly increased, apparently<br />

was stratum.<br />

In Hrastnik mine was used for coal mining over the excavation methods. Here we describe only two, which are<br />

most characteristic of mine.The oldest mining method which was used from the start of excavation to the middle<br />

60 years of the last century, the lateral chamber mining method. Transverse chamber mining method consists of<br />

the arrow lines, which is manufactured using layers of coal in the normal east-west direction, depending on the<br />

location coal layer, normal to the direction line are manufactured struts. Directional line is constructed on the<br />

excavation floor, which are from top to bottom. Rippers floor of the main horizons associated with the route for<br />

the expedition team, delivery of materials, ventilation, drainage and transportation of coal.<br />

From the transverse line (normal) to layer a distance of 5 m were built struts to full floor strata or caprock. Cross<br />

then under paragraphs expand into the chamber in the opposite direction making cross member. Space<br />

(chamber), which is caused by coal excavation backfilling of backfill materials often this was floor strata (clay<br />

soil). Backfill excavation area was first settled later manually with pneumatic backfilling. After suspending the<br />

filling occurred mine fires.<br />

Long wall mining method to increase height<br />

Long wall mining method to increase the amount of the highly productive mining method, which is currently in<br />

use. Method is used in combination with dust self-propelled hydraulic supports. Mining the vast amounts of 50<br />

m to 80 m height, 10 m to 15 m. Daily production ranged from 2000 t / d to 3000 t / day.<br />