<strong>Nuclear</strong> power plants: Operating results 2022<br />

<strong>atw</strong> Vol. 68 (2023) | Ausgabe 4 ı Juni<br />

80<br />

Emsland<br />

REPORT<br />

Operating sequence in 2022<br />

Electrical output in %<br />

100<br />

90<br />

80<br />

70<br />

60<br />

50<br />

40<br />

30<br />

20<br />

10<br />

0<br />

January February March April May June July August September October November December<br />

100 Apart from the 16.6 days refueling outage the Emsland nuclear<br />

power plant had been operating uninterrupted and mainly at full<br />

load 80 during the review period 2022. Producing a gross power<br />

generation of 11,356,583 MWh with a capacity factor of 95.37 %<br />

60<br />

the power plant achieved a very good operating result.<br />

40<br />

Planned shutdowns<br />

20<br />

35 rd Refueling and 34 rd overall maintenance outage:<br />

The annual outage was scheduled <strong>for</strong> the period 6 May to 25 May<br />

0<br />

2022. The outage took 18.7 days from breaker to breaker. During<br />

the 35 rd refueling none new fuel elements were used. The following<br />

100 major maintenance and inspection activities were carried<br />

out:<br />

80<br />

• Inspection of core and reactor pressure vessel internals.<br />

60<br />

• Inspection of pressurizer valves.<br />

• Pressure test on different coolers and tanks.<br />

40<br />

• Pressure test on residual heat exchange.<br />

• 20Inspection of feedwater tank.<br />

0<br />

Unplanned shutdowns and reactor/turbine trip<br />

None.<br />

<strong>Power</strong> reductions above 10 % and longer than <strong>for</strong> 24 h<br />

11 April to 6 May 2022: Stretch-out operation.<br />

13 November 2022<br />

to 21 January 2023: Stretch-out operation.<br />

Delivery of fuel elements<br />

In 2022 no fuel elements were delivered.<br />

Waste management status<br />

No CASTOR © cask loading was carried out during the review period<br />

2022.<br />

At the end of the year 47 loaded casks were stored in the local<br />

interim storage facility owned by BGZ Gesellschaft für Zwischenlagerung<br />

mbH.<br />

General points<br />

None.<br />

Positionierung:<br />

Bezug, links, unten<br />

X = 20,475 Y = 95,25 B = 173,5 H = 38,2<br />

VGB: HKS6K 30 %<br />

<strong>atw</strong>: 100 60 0 0<br />

66 | vgbe energy journal Report 5 · 2023<br />

Operating results 2022