<strong>Nuclear</strong> power plants: Operating results 2022<br />
<strong>atw</strong> Vol. 68 (2023) | Ausgabe 4 ı Juni<br />
80<br />
Emsland<br />
REPORT<br />
Operating sequence in 2022<br />
Electrical output in %<br />
100<br />
90<br />
80<br />
70<br />
60<br />
50<br />
40<br />
30<br />
20<br />
10<br />
0<br />
January February March April May June July August September October November December<br />
100 Apart from the 16.6 days refueling outage the Emsland nuclear<br />
power plant had been operating uninterrupted and mainly at full<br />
load 80 during the review period 2022. Producing a gross power<br />
generation of 11,356,583 MWh with a capacity factor of 95.37 %<br />
60<br />
the power plant achieved a very good operating result.<br />
40<br />
Planned shutdowns<br />
20<br />
35 rd Refueling and 34 rd overall maintenance outage:<br />
The annual outage was scheduled <strong>for</strong> the period 6 May to 25 May<br />
0<br />
2022. The outage took 18.7 days from breaker to breaker. During<br />
the 35 rd refueling none new fuel elements were used. The following<br />
100 major maintenance and inspection activities were carried<br />
out:<br />
80<br />
• Inspection of core and reactor pressure vessel internals.<br />
60<br />
• Inspection of pressurizer valves.<br />
• Pressure test on different coolers and tanks.<br />
40<br />
• Pressure test on residual heat exchange.<br />
• 20Inspection of feedwater tank.<br />
0<br />
Unplanned shutdowns and reactor/turbine trip<br />
None.<br />
<strong>Power</strong> reductions above 10 % and longer than <strong>for</strong> 24 h<br />
11 April to 6 May 2022: Stretch-out operation.<br />
13 November 2022<br />
to 21 January 2023: Stretch-out operation.<br />
Delivery of fuel elements<br />
In 2022 no fuel elements were delivered.<br />
Waste management status<br />
No CASTOR © cask loading was carried out during the review period<br />
2022.<br />
At the end of the year 47 loaded casks were stored in the local<br />
interim storage facility owned by BGZ Gesellschaft für Zwischenlagerung<br />
mbH.<br />
General points<br />
None.<br />
Positionierung:<br />
Bezug, links, unten<br />
X = 20,475 Y = 95,25 B = 173,5 H = 38,2<br />
VGB: HKS6K 30 %<br />
<strong>atw</strong>: 100 60 0 0<br />
66 | vgbe energy journal Report 5 · 2023<br />
Operating results 2022