Roadway No.6 - FDC Grove Road<br />

Location: A collector roadway running south from Minute Maid Ramp Road Three.<br />

This road parallels Highway 27.<br />

Concerns:<br />

• Runs directly adjacent to four residential<br />

subdivisions, Westbury, Tivoli Manor,<br />

Regency Place, Holly Hill Estates;<br />

• Runs directly adjacent to planned and<br />

approved residential subdivisions;<br />

• Runs directly adjacent to individual<br />

residential homesites;<br />

• FDC Grove Road, which would need to<br />

be utilized to reach Minute Maid Ramp<br />

Road Three headed west, is between two<br />

residential subdivisions, Sunset Ridge<br />

Phase One and Sunset Ridge Phase Two;<br />

Headed east on Minute Maid Ramp Road<br />

Three to Highway 27 would run traffic<br />

adjacent to a residential subdivision and<br />

there is not a curb cut for traffic to flow<br />

north on Highway 27.<br />

• Traffic would still need to utilize Holly<br />

Hill Grove Road Two, Holly Hill Grove<br />

Road Three, Minute Maid Ramp Road<br />

One, and/or Minute Maid Ramp Road<br />

Two, to get to Highway 27 which not<br />

have a signalized intersection for traffic to safely flow north on to Highway 27;<br />

• As noted on earlier pages, Polk County does not have plans to signalize any <strong>of</strong><br />

the aforementioned intersections on Highway 27.<br />

• Page 13 <strong>of</strong> CPA 09A-II Long Range Planning Division Staff Report states,<br />

"The Comprehensive Plan and the Land Development Code allow truck traffic<br />

on collector roads, but the proposed text to the Comprehensive Plan would<br />

restrict heavy trucks from using the east west roads and the direct vicinity and<br />

the portion <strong>of</strong>FDC Grove Road south <strong>of</strong>the northern terminus <strong>of</strong>the subject<br />

site. Additionally, LDC 08T-06 was approved by the Board, and required<br />

development that impacts FDC Grove Road to construct their impacted portion<br />

<strong>of</strong>FDC Grove Road to collector standards or pay a fee in lieu <strong>of</strong> construction to<br />

the County."<br />