18.02.2013 Views

complete agenda - Florida Department of Environmental Protection

complete agenda - Florida Department of Environmental Protection

complete agenda - Florida Department of Environmental Protection

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(b) Applicant will consult and obtain FFWCC’s approval on the route <strong>of</strong> the Minute<br />

Maid Ramp Road Two extension through their property. The extension shall not<br />

impede into the wetland area, and adequate buffers will be placed to prevent<br />

run<strong>of</strong>f from entering the wetland area either by surface run<strong>of</strong>f or by seepage from<br />

the road <strong>of</strong> Applicant’s retained property into the subsoil and into the wetland<br />

area.<br />

(c) Applicant will ensure that all water run<strong>of</strong>f from the proposed route described in<br />

(b) above, as well as run<strong>of</strong>f from their adjacent property and the Polyak<br />

properties, is to be diverted away from Hilochee’s Osprey Unit lands.<br />

DSL STAFF RECOMMENDATION: Approve<br />

ARC RECOMMENDATION:<br />

( ) Approve<br />

( ) Approve with modifications:<br />

( ) Defer<br />

( ) Withdraw<br />

( ) Not Approve<br />

( ) Other:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!