ARTICLE 27<br />

GREEN SWAMP AREA OF CRITICAL STATE CONCERN (ACSC)<br />

compensated to avoid a taking <strong>of</strong> property and must include all mitigation<br />

measures as required by applicable local, regional and state agencies.<br />

27.08.00.00 TRANSIT DISTRICT REQUIREMENTS<br />

Submission <strong>of</strong> a voluntary petition for inclusion into the Lakeland Area Mass Transit<br />

District (LAMTD) shall be required for the following developments within the Green<br />

Swamp ACSC, prior to issuance <strong>of</strong> site plan approval, subdivision plat approval or<br />

building permit:<br />

a. All development along Interstate 4 or SR 33<br />

b. Any development or redevelopment in a non-residential or multi-family residential<br />

zoning district<br />

c. Any residential subdivision <strong>of</strong> 10 acres or more<br />

27.09.00.00 WETLANDS AND FLOODPLAIN AREAS<br />

27.09.01.00 DEVELOPMENT CRITERIA<br />

a. No new lots shall be created which are entirely within a wetland or FEMA<br />

designated 1 OO-year floodplain area.<br />

Amend.10 b. No development shall be permitted within an identified wetland or within the 100year<br />

floodplain area except where allowed by the applicable federal, state or<br />

regional permitting agencies and as specified below. Development shall cluster in<br />

non-wetland and non-floodplain areas. All structures (other than pile supported<br />

docks) shall be set back a minimum <strong>of</strong> 50 feet from the most landward extent <strong>of</strong> a<br />

jurisdictional wetland.<br />

Amend.10 c. No disturbance <strong>of</strong> wetlands within the Green Swamp ACSC is allowed unless<br />

authorized or exempted from the regulation by the <strong>Florida</strong> <strong>Department</strong> <strong>of</strong><br />

<strong>Environmental</strong> <strong>Protection</strong>, the U.S. Army Corps <strong>of</strong> Engineers, and the applicable<br />

water management district. Evidence <strong>of</strong> the appropriate permit or exemption shall<br />

be required prior to the issuance <strong>of</strong> a development permit.<br />

Amend.10 d. Where impacts to wetlands cannot be avoided, all permits for an agency with<br />

jurisdiction shall be approved prior to the City issuing a final development order.<br />

An "intent to issue a final development order" may be issued in writing prior to the<br />

issuance <strong>of</strong> said order if pre-approval is required by an agency with jurisdiction.<br />

Consideration <strong>of</strong> wetland impacts shall include, but not necessarily be limited to,<br />

the following circumstances where no reasonable alternative exists:<br />

(1) To provide access to the site;<br />

(2) To provide necessary internal traffic circulation;<br />

(3) To provide necessary utility lines;<br />

(4) To provide necessary pre-treated stormwater management;<br />

(5) For purposes <strong>of</strong> public safety;<br />

(6) To avoid precluding all beneficial use <strong>of</strong> the property.<br />

e. All wetland and 1DO-year floodplain areas must be identified as environmental<br />

set-aside areas on all final site plans or subdivision plats.<br />

27.6