24.02.2013 Views

om e 's Ali a - Land ss De elo en - Friedrich-Ebert-Stiftung, India Office

om e 's Ali a - Land ss De elo en - Friedrich-Ebert-Stiftung, India Office

om e 's Ali a - Land ss De elo en - Friedrich-Ebert-Stiftung, India Office

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

42<br />

W<strong>om</strong><strong>en</strong>’s <strong>Ali</strong><strong>en</strong>ation<br />

Table 2: Distribution of Private <strong>Land</strong> and Governm<strong>en</strong>t Rev<strong>en</strong>ue <strong>Land</strong><br />

in Five Villages<br />

Name of the village Private land (in Ha.) Govt. land (in Ha.) Total land (in Ha.)<br />

Nagarnar 157.71 106.05 263.76<br />

Kasturi 62.55 5.32 67.87<br />

Chokawada 4.18 11.62 15.80<br />

Amaguda 43.44 0.17 43.61<br />

Maganpur 25.11 0.81 25.92<br />

Total 292.99 123.97 416.96<br />

Amaguda railway station to plant<br />

site (approx. 2 km.). With the<br />

pres<strong>en</strong>t patch of land id<strong>en</strong>tified,<br />

the township will be located on<br />

eastern side of the existing village<br />

road leading to Nagarnar fr<strong>om</strong> NH<br />

43 and steel plant will be located<br />

on the western side of the village<br />

road.<br />

G<strong>en</strong>esis of the Movem<strong>en</strong>t<br />

The g<strong>en</strong>esis of the ongoing conflict<br />

betwe<strong>en</strong> the local administration and<br />

the local people, majority b<strong>elo</strong>nging<br />

to tribals, is due to acquisition of<br />

land fr<strong>om</strong> the villages of Nagarnar,<br />

Amaguda, Kasturi, Chokawada and<br />

Maganpura for plant at Nagarnar.<br />

The initial plan was to establish the<br />

plant at Hiranar (in Pantewar district)<br />

in 1996. The area of Hiranar was<br />

pred<strong>om</strong>inantly inhabited by the<br />

Madia tribals Primitive Tribal Group<br />

(PTG). The pres<strong>en</strong>t Industry Minister<br />

of MP Governm<strong>en</strong>t, Mah<strong>en</strong>dra<br />

Karma gave a lease of 300 acres of<br />

governm<strong>en</strong>t land and 700 acres of<br />

private land for the plant. Since the<br />

estimation for levelling cost was very<br />

high, and expecting strong resistance<br />

fr<strong>om</strong> the tribals, the idea of<br />

establishing a plant there was giv<strong>en</strong><br />

up. Again, in 1996, the Congre<strong>ss</strong><br />

Governm<strong>en</strong>t headed by Digvijaya<br />

Singh tried to set up the plant at<br />

Gurram in Dantewada district. In<br />

2000 again the project was dropped<br />

due to high productivity costs. The<br />

land was not level and the levelling<br />

cost was estimated to be very high.<br />

Finally in May 2001 NMDC decided<br />

to establish the plant at Nagarnar<br />

acquiring land fr<strong>om</strong> five villages. The<br />

area of Nagarnar fulfills all the basic<br />

requirem<strong>en</strong>ts to set up a steel plant

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!